Van's Issues RV-12 Service Bulletin | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Mon, Feb 28, 2022

Van's Issues RV-12 Service Bulletin

Required Fix to Strengthen Rear Tailcone Skins

Van's has issued a service bulletin for RV-12 and RV-12iS aircraft, specifically requiring owners to inspect the lower portion of the tailcone for cracks, and install stiffening equipment to bolster them should damage be found. 

Van's issued the warning after receiving reports of cracking along the lower tailcone skins of RV-12 near the tail bulkheads, observed along the centerline of the plane. Even if cracking is not evident, owners are required to install the support clips. If damage is uncovered, then an additional patch plate will need to be fabricated and installed all at once. Depending on the level of cracking present, the fix may require additional patchwork past the damaged piece, as the bulletin requires that "the patch should capture at least 3 rivets past the crack in the skin or forward and aft of the bulkhead and 2 rivets left and right of centerline." For the average experienced builder or A&P, Vans estimates the job will take just under 2 and 1/2 hours. Those completing the patch plate installation should be ready to clip to the bulkhead below. Home builders should be ready to use a tail stand to prevent the rear of the aircraft from striking the ground while work is performed.

 Accessing the deeper portion of the tailcone bulkhead will require additional, temporary plywood reinforcement to protect the skin between each rib during the install. Owners at least have a while to comply, with the work required "Within 100 hours or at the next 12-month inspection, whichever occurs first." For the full bulletin and step by step directions, see the Van's website below.

FMI: www.vansaircraft.com

Advertisement

More News

Bolen Gives Congress a Rare Thumbs-Up

Aviation Governance Secured...At Least For a While The National Business Aviation Association similarly applauded the passage of the FAA's recent reauthorization, contentedly recou>[...]

The SportPlane Resource Guide RETURNS!!!!

Emphasis On Growing The Future of Aviation Through Concentration on 'AFFORDABLE FLYERS' It's been a number of years since the Latest Edition of Jim Campbell's HUGE SportPlane Resou>[...]

Buying Sprees Continue: Textron eAviation Takes On Amazilia Aerospace

Amazilia Aerospace GmbH, Develops Digital Flight Control, Flight Guidance And Vehicle Management Systems Textron eAviation has acquired substantially all the assets of Amazilia Aer>[...]

Hawker 4000 Bizjets Gain Nav System, Data Link STC

Honeywell's Primus Brings New Tools and Niceties for Hawker Operators Hawker 4000 business jet operators have a new installation on the table, now that the FAA has granted an STC f>[...]

Echodyne Gets BVLOS Waiver for AiRanger Aircraft

Company Celebrates Niche-but-Important Advancement in Industry Standards Echodyne has announced full integration of its proprietary 'EchoFlight' radar into the e American Aerospace>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC