Closer Yet... Boeing Completes Fuselage Mods On Two More 787s | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Mon, Nov 16, 2009

Closer Yet... Boeing Completes Fuselage Mods On Two More 787s

Still Shooting For A First Flight In '09

Boeing is confirming that they have completed installing reinforcements within the 'side-of-body section' of two more 787 Dreamliners. Over the weekend, employees at Boeing's facility in Everett, Wash., finished reinforcing the full-scale static test airframe and the second Dreamliner designated for flight test. Installations were completed Nov. 11 on the first flight-test airplane.

The modification entails installing new fittings at 34 stringer locations within the joint where the wing is attached to the fuselage.

"Our focus now is on completing the static test later this month, which will validate the modification," said Scott Fancher, vice president and general manager of the 787 program. "Concurrently we are restoring the airplanes and completing the functional tests required to fly by the end of the year."

The static test airframe is being refitted with strain gauges and instrumentation required for testing. Access doors, systems, seals and fasteners removed from airplane No. 2 to provide access are being restored in preparation for continued testing on the airplane. The first 787 also is being restored. Fancher said the program is on track to fly the 787 by the end of the year.

"We are building momentum with each milestone we achieve," Fancher said. "This team is focused on its goals and bringing us ever closer to first flight."

FMI: www.boeing.com/commercial/787family/index.html

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC