AD: Airbus SAS Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.02.24

Airborne-NextGen-12.03.24

Airborne-Unlimited-12.04.24

Airborne Flt Training-12.05.24

Airborne-Unlimited-12.06.24

Mon, Aug 12, 2019

AD: Airbus SAS Airplanes

AD NUMBER: 2019-14-06

PRODUCT: Certain Airbus SAS Model A319-111, -112, -115, and -131 airplanes, and Model A320-214 and -232 airplanes.

ACTION: Final rule; request for comments.

SUMMARY: This AD was prompted by a report of the fracture of a main landing gear (MLG) sliding tube axle, and an investigation that determined the cause to be an incorrect repair.

This AD requires a repetitive magnetic particle inspection (MPI) of affected MLG sliding tubes for discrepancies; a one-time Barkhausen noise inspection (BNI) or alternative non-destructive test (NDT) inspection, and a detailed visual inspection of affected MLG sliding tube axles for discrepancies; and corrective actions if necessary, as specified in a European Union Aviation Safety Agency (EASA) AD, which is incorporated by reference.

Accomplishing the BNI and applicable corrective actions, or replacing the affected parts, constitutes terminating action for the repetitive MPI.

DATES: This AD becomes effective August 23, 2019. Comments must be received by September 23, 2019.

COST: The FAA estimates that this AD affects 1 airplane of U.S. registry. Operators may incur the following costs in order to comply with this AD:

  • Labor: Up to 14 work-hours × $85 per hour = Up to $1,190 per aircraft
FMI: AD

Advertisement

More News

NTSB Final Report: Michael G Darby DARD 1

After Landing He Realized He Had Misidentified The Runway And Landed In Softer Snow Analysis: The pilot reported that during approach to the snow-covered runway in flat light condi>[...]

ANN's Daily Aero-Term (12.04.24): Arresting System

Arresting System A safety device consisting of two major components, namely, engaging or catching devices and energy absorption devices for the purpose of arresting both tailhook a>[...]

Aero-News: Quote of the Day (12.04.24)

“We learned a great deal in the process, such as greater coding skills, soldering techniques, and video editing skills...” Source: Cuyahoga County Team Captain John Ana>[...]

Airborne Affordable Flyers 11.26.24: BushCat's Back!, LODA Update, DRL Miami

Also: Van Celebrates 85th, Trio Pro Pilot Autopilot, Joby on MSFS24, Sonex Transition The BushCat was manufactured in South Africa by SkyReach beginning in 2014, selling its first >[...]

Airborne 12.02.24: Electra FG EIS, Prez Osprey Problems, Starship Wants 25

Also: EAA Ray Foundation, MagniX Records, Ruko U11MINI Drone, RCAF PC-21s Elektra Solar recently put the first aircraft from its Elektra Trainer Fixed-Gear (FG) family into service>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC