NASA Awards Rapid II Space Development Contracts | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-SpecialEpisode-12.15.25

AirborneNextGen-
12.16.25

Airborne-Unlimited-12.10.25

Airborne-AffordableFlyers-12.11.25

AirborneUnlimited-12.12.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Thu, Mar 22, 2007

NASA Awards Rapid II Space Development Contracts

Inexpensive Satellites The Goal

Aero-News learned this week NASA selected Space Systems Loral of Palo Alto, CA and MicroSat Systems of Littleton, CO for award of two Rapid Spacecraft Development Office -- known as Rapid II -- contracts with a minimum value of $50,000 each.

This award is under a commercial, fixed price, indefinite delivery/indefinite quantity contract. Each of the Rapid II contracts has a potential maximum value of $1.5 billion.

Rapid II is a multiple award contract for core spacecraft systems and non-standard services. The services may include operations, components and studies to meet the government's space, Earth science and technology needs.

The principal purpose of this contract is to provide core spacecraft systems with any necessary modifications to meet specific mission needs. The baseline scope of work includes fabrication and test of the spacecraft with mission specific design modifications; generation of interface control documents, instrument and full spacecraft integration; test, shipment to launch site, launch vehicle integration support and on-orbit checkout.

In January 2000, NASA awarded the initial Rapid II contracts. New vendors periodically are added if qualified. This award is the result of such an action, and the vendors are eligible to compete for future spacecraft systems that NASA or other federal agencies may require.

The principal work will be performed at the contractors' facilities with additional work required at the government launch site.

FMI: www.nasa.gov

Advertisement

More News

Aero-News: Quote of the Day (12.18.25)

“These new aircraft strengthen our ability to respond quickly, train effectively and support communities nationwide. Textron Aviation has been a steadfast supporter in helpin>[...]

Classic Aero-TV: Viking Twin Otter 400--Bringing the DHC-6 Back Into Production

From 2011 (YouTube Edition): Rugged, Legendary, STOL Twin Makes A Comeback The de Havilland Twin Otter is an airplane with a long history, and it gained a reputation as a workhorse>[...]

NTSB Final Report: Rans Employee Flying Club Rans S-6ES Coyote II

A Wind Gust Lifted The Right Wing And The Airplane Turned To The Left Analysis: The pilot was departing from a 2,395-ft-long by 50-ft-wide turf runway. The pilot reported that afte>[...]

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

ANN's Daily Aero-Term (12.18.25): Braking Action Advisories

Braking Action Advisories When tower controllers receive runway braking action reports which include the terms “medium," “poor," or “nil," or whenever weather con>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC