Parachute Failure Mars NASA's Second LDSD Test | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Wed, Jun 10, 2015

Parachute Failure Mars NASA's Second LDSD Test

Chute Did Not Fully Deploy, Data Being Analyzed

NASA’s Low-Density Supersonic Decelerator (LDSD) project completed its second flight test when the saucer-shaped craft splashed down safely Monday in the Pacific Ocean off the coast of the Hawaiian island of Kauai Monday.

NASA said in a news release that two experimental decelerator technologies – a supersonic inflatable aerodynamic decelerator and a supersonic parachute – were tested. The supersonic inflatable aerodynamic decelerator deployed and inflated. The supersonic parachute also deployed; however, it did not perform as expected. Data were obtained on the performance of both innovative braking technologies, and the teams are beginning to study the data.

NASAspaceflight.com reports that the test was still considered a success. The LDSD was carried to 120,000 feet by a large balloon and released. The four rocket motors designed to spin the disc to give it gyroscopic stability fired as expected, as did the main rocket motor which carried the disk to 180,000 feet. The  Supersonic Inflatable Aerodynamic Decelerator (SAID) deployed nominally, slowing the disk form Mach 3.8 to Mach 2.5.

But as with the last test, the parachute failed to fully deploy. While that was not so much of a concern for the first test, it was one of the major test parameters following a redesign of the parachute system.

NASA is still analyzing the data to determine its next steps in the program.

(Images provided by NASA)

FMI: www.nasa.gov/mission_pages/tdm/ldsd/index.html


Advertisement

More News

NTSB Final Report: Douglas A-4K

Pilot Applied Full Aft Stick And Nose-Up Trim, But The Airplane Remained On The Runway Analysis: The pilot reported that a preflight inspection and flight control checks revealed n>[...]

ANN FAQ: Q&A 101

A Few Questions AND Answers To Help You Get MORE Out of ANN! 1) I forgot my password. How do I find it? 1) Easy... click here and give us your e-mail address--we'll send it to you >[...]

Classic Aero-TV: PBY Catalina--From Wartime to Double Sunrise to the Long Sunset

From 2022 (YouTube Edition): Before They’re All Gone... Humankind has been messing about in airplanes for almost 120-years. In that time, thousands of aircraft representing i>[...]

ANN's Daily Aero-Term (07.01.25): Advanced Air Mobility (AAM)

Advanced Air Mobility (AAM) A transportation system that transports people and property by air between two points in the NAS using aircraft with advanced technologies, including el>[...]

ANN's Daily Aero-Linx (07.01.25)

Aero Linx: MQ-1B Predator The MQ-1B Predator is an armed, multi-mission, medium-altitude, long-endurance remotely piloted aircraft that is employed primarily as an intelligence-col>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC