Orion Parachute Test Goes... Ah, Not Well | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-SpecialEpisode-12.15.25

AirborneNextGen-
12.16.25

Airborne-Unlimited-12.10.25

Airborne-AffordableFlyers-12.11.25

AirborneUnlimited-12.12.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sat, Aug 23, 2008

Orion Parachute Test Goes... Ah, Not Well

Yep, They're Gonna NEED To Fix This

A preliminary test of the parachute system designed to softly return NASA's upcoming Crew Exploration Vehicle to Earth failed in spectacular fashion last month, resulting in an Orion-sized dent in the Arizona desert landscape.

According to NASA, a test set-up parachute failed during the July 31, test of parachutes for the recovery system for the Orion. From the start, the test was in trouble... as one of the so-called "programmer" chutes failed to inflate properly. As a result, instead of falling right-side-up, the wooden capsule mock-up tumbled almost from the moment it was released from the C-17 carrier aircraft.

The troublesome chute was one of 18 parachutes used during the test... but created a domino effect, that extended to the capsule's main 'chute system when the time came for that to be deployed. Only one of the three main parachutes for the recovery system remained attached to the mock-up... and that parachute was torn and too damaged to inflate properly.

The result will be familiar to anyone who grew up watching Warner Brothers cartoons. Like the hapless Coyote, attached to the latest contrivance from ACME... the Orion mockup landed with a solid thud on the desert floor. (NASA remains mum on whether any Roadrunners were present at the time -- Ed.)

Granted, it's still early in the Orion's development cycle; the first manned flight isn't scheduled to fly until 2015. But an unmanned launch is scheduled for late-2009... and this failure is the latest in a series of stumbling points for Orion, and the beleaguered Constellation program.

In happier news: rumor has it the mockup's toilets worked perfectly...

FMI: www.nasa.gov

Advertisement

More News

Aero-TV: DeltaHawk’s Diesel Power Steps Into the Spotlight

Its Offerings Are Lighter, Cleaner, and Now Pushing Past 1,000nm on SAF Jet Fuel DeltaHawk’s diesel-powered aircraft lineup has seen incredible upgrades over the last few yea>[...]

NTSB Prelim: Mooney Aircraft Corp. M20K

The Airplane Experienced A Total Loss Of Engine Power On December 3, 2025, about 1600 central standard time, a Mooney Aircraft Corp. M20K, N57229, was substantially damaged when it>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

ANN's Daily Aero-Linx (12.20.25)

Aero Linx: European Society of Aerospace Medicine (ESAM) As a pan-European, independent forum, it works to promote the safety and health of all persons involved in aviation and spa>[...]

Aero-News: Quote of the Day (12.20.25)

“We are excited to see Wisk achieve this milestone, and I’m so proud of the team that made it possible. The team at Wisk has built advanced technologies across flight c>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC