Airbus Military Completes A400M Full Scale Fatigue Tests For EASA Certification | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Tue, Mar 08, 2011

Airbus Military Completes A400M Full Scale Fatigue Tests For EASA Certification

The Test Airframe Has Successfully Completed The Number Of Required Simulated Flight-Cycles

Airbus Military has successfully completed the number of required simulated flight-cycles on a full scale test airframe to achieve civil type certification of the A400M by the European Aviation Safety Agency (EASA).

1,665 simulated flights are required for European Aviation Safety Agency (EASA) type certification of the A400M. Airubs planned a total of 25,000 simulated flights over an 18 month period - equating to 2.5 times the A400M's design-life. Static testing of another A400M test airframe, MSN5000 was completed in Madrid in September 2010. That airframe continues to be used for further fatigue tests of composite structures which will last until early 2012.

The test program is required to simulate flights at least one year ahead of the actual operations performed by the aircraft. The test specimen at Dresden, known as MSN5001, has now undergone the required number of cycles, which equates to about five times the maximum number of flights expected to be recorded annually by each A400M in service, in order to give a large safety margin.

The German government recently reached an agreement with Airbus to buy 53 of the A400M airlifters, and plans to sell 13 to outside parties. That agreement reportedly removed the final hurdle to completing the long-overdue and over-budget transport aircraft. A consortium of European governments which had been working to rescue the project agreed to a price increase that will push the overall cost of the aircraft to the various governments to nearly $2.7 billion.

FMI: www.airbus.com

Advertisement

More News

ANN's Daily Aero-Linx (06.29.25)

Aero Linx: Transport Canada We are a federal institution, leading the Transport Canada portfolio and working with our partners. Transport Canada is responsible for transportation p>[...]

ANN's Daily Aero-Term (06.29.25): Gross Navigation Error (GNE)

Gross Navigation Error (GNE) A lateral deviation from a cleared track, normally in excess of 25 Nautical Miles (NM). More stringent standards (for example, 10NM in some parts of th>[...]

Classic Aero-TV: Anticipating Futurespace - Blue Origin Visits Airventure 2017

From AirVenture 2017 (YouTube Edition): Flight-Proven Booster On Display At AirVenture… EAA AirVenture Oshkosh is known primarily as a celebration of experimental and amateu>[...]

NTSB Final Report: Cirrus SR22

Aircraft Parachute System (CAPS) Was Deployed About 293 Ft Above Ground Level, Which Was Too Low To Allow For Full Deployment Of The Parachute System Analysis: The day before the a>[...]

Airborne Affordable Flyers 06.26.25: PA18 Upgrades, ‘Delta Force’, Rhinebeck

Also: 48th Annual Air Race Classic, Hot Air Balloon Fire, FAA v Banning 100LL, Complete Remote Pilot The news Piper PA-18 Super Cub owners have been waiting for has finally arrived>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC