Second Production VH-71 Takes Flight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.01.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-12.03.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Fri, Dec 05, 2008

Second Production VH-71 Takes Flight

Will Join Others At NAS Patuxent River For Testing

The VH-71 presidential helicopter replacement program marked another milestone last Saturday with the maiden flight of the second VH-71 production aircraft. The aircraft is scheduled to arrive at US Naval Air Station Patuxent River, MD, later this month.

As ANN reported, the first production VH-71 arrived at the Navy's facility November 24, and is conducting ground vibration testing.

Five production and four test helicopters make up the program's first phase, or Increment One. The Increment One helicopters provide more capability than the current fleet which is scheduled to begin phasing out of operational service at a rate of three per year beginning in 2017.

Of the four test aircraft, two are in flight testing with a joint testing team made up of Navy, Marine Corps and industry pilots. The other two are undergoing mission systems integration at Lockheed Martin's facility in Owego, NY.

Lockheed Martin Systems Integration-Owego is the prime contractor and systems integrator for the VH-71 program with overall responsibility for the program and aircraft system. AgustaWestland, the principal subcontractor, has responsibility for the basic air vehicle design, production build, and basic air vehicle support functions. Lockheed Martin and AgustaWestland have partnered for more than 17 years with a worldwide record of excellence dating back to the Royal Navy's EH101 Merlin Mk1 program.

FMI: www.lockheedmartin.com, www.agustawestland.com

Advertisement

More News

Classic Aero-TV: VerdeGo Debuts VH-3 Hybrid-Electric Powerplant

From 2023 (YouTube Edition): New Propulsion Scheme Optimized for AAM Applications Founded in 2017 by Eric Bartsch, Pat Anderson, and Erik Lindbergh (grandson of famed aviation pion>[...]

NTSB Prelim: Grumman American Avn. Corp. AA-5B

During The Initial Climb, The Engine Began To Operate Abnormally And, After About Three Seconds, Experienced A Total Loss Of Power On October 29, 2025, about 1820 Pacific daylight >[...]

ANN's Daily Aero-Linx (12.02.25)

Aero Linx: Women in Aviation International Women in Aviation International is the largest nonprofit organization that envisions a world where the sky is open to all, and where avia>[...]

Aero-News: Quote of the Day (12.02.25)

“We’ve paid for the cable line’s repair for the customer and have apologized for the inconvenience this caused them...” Source: Some followup info from an A>[...]

Aero-News: Quote of the Day (12.03.25)

“We have long warned about the devastating effects of pairing optimization. Multiple times over many months, we highlighted how schedule manipulation, unbalanced schedules, a>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC