Urgent CASA AD: PZL-104 Aeroplanes - All models | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.09.25

Airborne-Unlimited-12.10.25

Airborne-AffordableFlyers-12.11.25

AirborneUnlimited-12.12.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Tue, Jun 14, 2005

Urgent CASA AD: PZL-104 Aeroplanes - All models

AD/WILGA/4 Elevator Control System Rotational Control Rod 8/2005TX

Applicability: PZL-104 Aeroplanes - All models.

Requirement: 1. Carry out an inspection of the elevator control system rotational control rod, part number (PN) WM261610 for correct security of the adjustment fork end with a safety nut.

2. If the adjustment fork end is secured properly make an entry in the aircraft maintenance log. No further action is required.

3. If the adjustment fork end is not appropriately secured (the safety nut loose, not tightened): a. Secure the adjustment fork end by way of pal-nut tightening; and b. Carry out a check of the adjustment of the control system and elevator deflection angles and carry out any subsequent adjustments; and c. Report the findings to the aircraft manufacturer.

For aeroplanes fitted with a dual control system, rotational control rods must be checked on both controls.

Note: Polish Civil Aviation Office Airworthiness Directive (AD) Number SP-0004-2005-A dated 17 May 2005 refers.

Compliance: 1. Before further flight, after the effective date of this Directive.

2. Following the inspection detailed in Requirement 1 of this Directive.

3. a. Before further flight, following completion of Requirement 1 of this Directive. b. Before further flight, following completion of Requirement 1 of this Directive.

c. Following completion of Requirement 1 of this Directive.

This Airworthiness Directive becomes effective on 14 June 2005.

Background: An accident occurred when the adjustment forked end of the rotational control rod in the elevator control system became loose, resulting in decoupling and blockage of the control system.

The Requirements specified in this AD address the identified unsafe condition.

FMI: http://casa.gov.au/airworth/airwd/NEW/urgent.htm

Advertisement

More News

Aero-News: Quote of the Day (12.11.25)

"The owners envisioned something modern and distinctive, yet deeply meaningful. We collaborated closely to refine the flag design so it complemented the aircraft’s contours w>[...]

ANN's Daily Aero-Term (12.11.25): Nonradar Arrival

Nonradar Arrival An aircraft arriving at an airport without radar service or at an airport served by a radar facility and radar contact has not been established or has been termina>[...]

Classic Aero-TV: David Uhl and the Lofty Art of Aircraft Portraiture

From 2022 (YouTube Edition): Still Life with Verve David Uhl was born into a family of engineers and artists—a backdrop conducive to his gleaning a keen appreciation for the >[...]

Airborne-NextGen 12.09.25: Amazon Crash, China Rocket Accident, UAV Black Hawk

Also: Electra Goes Military, Miami Air Taxi, Hypersonics Lab, MagniX HeliStrom Amazon’s Prime Air drones are back in the spotlight after one of its newest MK30 delivery drone>[...]

Airborne 12.05.25: Thunderbird Ejects, Lost Air india 737, Dynon Update

Also: Trailblazing Aviator Betty Stewart, Wind Farm Scrutiny, Chatham Ban Overturned, Airbus Shares Dive A Thunderbird pilot, ID'ed alternately as Thunderbird 5 or Thunderbird 6, (>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC