RV-10 Kits To Be Produced With Final-Size Holes Drilled | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Tue, Aug 04, 2020

RV-10 Kits To Be Produced With Final-Size Holes Drilled

RV-10 Construction Just Got A LOT Easier

Van’s Aircraft has initiated the process of phasing in the production of final-size, matched-hole RV-10 parts. Until now, all parts for the RV-10 have been produced with slightly undersized holes, which the builder must up-size with a drill and then debur prior to assembly.

The company notes that, "We will be transitioning the RV-10 kit to final-sized holes, much like the RV-14 and RV-12iS kits. There is no increase in kit prices associated with this planned change.

We are excited to remove a portion of the initial work that builders need to perform on certain parts of the RV-10 airframe assembly with this change. Aircraft parts with final-size holes may be dimpled and then assembled right out of the box, after deburring the edges of each part as needed. This removes the need to first cleco the parts together, drill them to size in assembly, then disassemble and debur.

This manufacturing transition will take place over the next several months (we anticipate completing the transition sometime in early 2021). During the transition period, customers may receive some portion of their parts with final-sized holes and others without. Van’s will mark delivered kit parts to make the builder aware whether each part needs to be final-drilled and deburred, or not. We will also include instructions for the builder explaining how to identify which kit parts are/are not final-sized."

FMI: www.vansaircraft.com

Advertisement

More News

ANN's Daily Aero-Linx (06.29.25)

Aero Linx: Transport Canada We are a federal institution, leading the Transport Canada portfolio and working with our partners. Transport Canada is responsible for transportation p>[...]

ANN's Daily Aero-Term (06.29.25): Gross Navigation Error (GNE)

Gross Navigation Error (GNE) A lateral deviation from a cleared track, normally in excess of 25 Nautical Miles (NM). More stringent standards (for example, 10NM in some parts of th>[...]

Classic Aero-TV: Anticipating Futurespace - Blue Origin Visits Airventure 2017

From AirVenture 2017 (YouTube Edition): Flight-Proven Booster On Display At AirVenture… EAA AirVenture Oshkosh is known primarily as a celebration of experimental and amateu>[...]

NTSB Final Report: Cirrus SR22

Aircraft Parachute System (CAPS) Was Deployed About 293 Ft Above Ground Level, Which Was Too Low To Allow For Full Deployment Of The Parachute System Analysis: The day before the a>[...]

Airborne Affordable Flyers 06.26.25: PA18 Upgrades, ‘Delta Force’, Rhinebeck

Also: 48th Annual Air Race Classic, Hot Air Balloon Fire, FAA v Banning 100LL, Complete Remote Pilot The news Piper PA-18 Super Cub owners have been waiting for has finally arrived>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC