Avcorp Signs Production Contract With Boeing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.28.25

Airborne-NextGen-04.29.25

AirborneUnlimited-04.30.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Mon, Nov 02, 2015

Avcorp Signs Production Contract With Boeing

Will Provide Camera Fairings For KC-46 Tanker

Avcorp Industries has received notice of award from The Boeing Company for the production and supply of 767-2C panoramic camera fairings, as part of the KC-46 tanker program.

Each shipset of panoramic camera fairings consist of large and complex composites and metallic components which will be assembled into a fully integrated assembly in the Avcorp Delta facility. These fully integrated fairings attach directly to the 767-2C fuselage and will be delivered direct to the final assembly line in Everett, Washington.

Avcorp has been manufacturing and supplying Boeing with various aircraft components, including 737 wheel well fairings, 737 wing tip panels, metal bond partition panels for various Boeing aircraft and CH47 Chinook Helicopter cockpit nose enclosure assemblies and tunnel covers, for more than 20 years.

"This new contract underscores the importance of our longstanding supply partnership with Boeing.  We are proud that our supply partnership with Boeing continues to provide us with opportunities to contribute on yet another key platform with Boeing," said Peter George, Avcorp Industries Inc. CEO.

(Image from file)

FMI: www.avcorp.com

Advertisement

More News

Lockheed Hands Over Completed Artemis II Spacecraft

NASA Takes in Orion, Begins Launch Processing for a Crewed Mission Aerospace giant Lockheed Martin recently turned in its share of the Artemis II venture, delivering its Orion spac>[...]

NTSB Final Report: Pulsar Super Pulsar

During The Forced Landing, The Airplane Landed Short Of The Runway And Left Of The Runway Centerline Analysis: The pilot reported that, during the initial climb, the engine lost pa>[...]

Classic Aero-TV: Van Horn Rotor Blades -- Tail Rotor Replacements For Bell's 206

From 2010 (YouTube Edition): Company Pioneers Alternatives For Bell 206 TR Blades The approved part replacement business can be a tough one... especially when you're competing with>[...]

ANN's Daily Aero-Term (05.02.25): Obstacle

Obstacle An existing object, object of natural growth, or terrain at a fixed geographical location or which may be expected at a fixed location within a prescribed area with refere>[...]

Aero-News: Quote of the Day (05.02.25)

“NATA’s 3,700 member companies operate at nearly 4,500 airports in thousands of communities across the nation, providing air transportation services, driving economic g>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC