100th ISS Spacewalk Will Examine Array Joint Issue | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Sat, Dec 15, 2007

100th ISS Spacewalk Will Examine Array Joint Issue

Whitson, Tani To Perform Analysis December 18

An important spacewalk outside the International Space Station is scheduled for next week, that NASA hopes will provide some answers regarding a mysterious problem with a solar array joint. Station Commander Peggy Whitson and Flight Engineer Dan Tani will perform the 100th spacewalk in support of ISS assembly on Tuesday, December 18. They will inspect the starboard Solar Alpha Rotary Joint (SARJ) and the Beta Gimbal Assembly (BGA).

The SARJ and BGA have been temporarily locked in place while the solar arrays still produce power. Whitson and Tani completed a procedure review on Friday and held a tagup with the lead spacewalk officer on the ground.

Kirk Shireman, station program deputy manager called the spacewalk a "fact-finding mission." The spacewalkers will report back to ground controllers what they find and return a trundle assembly back inside the station. Specialists on the ground will use the results to determine how to restore the starboard solar array's sun-tracking capability.

A move of the Mobile Transporter to worksite 4 in the center of the station's truss Friday from worksite 7 -- to provide micrometeoroid debris protection to the spacewalkers -- was postponed Friday after station cameras detected what appeared to be a piece of insulation on the truss track. Flight controllers continue to analyze the situation, according to NASA.

FMI: www.nasa.gov/mission_pages/station/main/index.html

Advertisement

More News

NTSB Prelim: Piper PA-23

Pilot Also Reported That Due To A Fuel Leak, The Auxiliary Fuel Tanks Were Not Used On June 4, 2025, at 13:41 eastern daylight time, a Piper PA-23, N2109P, was substantially damage>[...]

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Classic Aero-TV: One Man’s Vietnam

From 2023 (YouTube Edition): Reflections on War’s Collective Lessons and Cyclical Nature The exigencies of war ought be colorblind. Inane social-constructs the likes of racis>[...]

ANN's Daily Aero-Linx (07.03.25)

Aero Linx: Colorado Pilots Association (CPA) Colorado Pilots Association was incorporated as a Colorado Nonprofit Corporation in 1972. It is a statewide organization with over 700 >[...]

ANN's Daily Aero-Term (07.03.25): High Speed Taxiway

High Speed Taxiway A long radius taxiway designed and provided with lighting or marking to define the path of aircraft, traveling at high speed (up to 60 knots), from the runway ce>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC