So Much For All Those California Jobs... Icon To Shift Composites Mfg To Mexico | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.15.25

AirborneNextGen-
09.09.25

Airborne-Unlimited-09.10.25

Airborne-AffordableFlyers-09.11.25

AirborneUnlimited-09.12.25

Fri, Sep 09, 2016

So Much For All Those California Jobs... Icon To Shift Composites Mfg To Mexico

Claim: Tijuana Plant Expected To Be Operating Early Next Year

Icon Aircraft, after failing to produce a workable manufacturing operation here in the states, will be shifting its composites fabrication to a plant to be built in Tijuana, Mexico early next year, according to reports in the Mexican media.

ElTijuanense.com reports that the company plans to invest more than $150 million in the plant, which will fabricate the composite components for the fuselage of the aircraft and ship them back to California for final assembly and flight testing. It is expected that more than 1,000 people will be employed at the plant.

Icon claims to have more than 1,800 deposits for the A5 amphibian airplane, according to the company... a number questioned by a number of industry observers. Tijuana was selected for its 'established industrial infrastructure, skilled labor force, and location near the final assembly plant in California', the report said.

The company has faced several questionable self-imposed challenges in bringing the A5 into production. While they made a big splash with the "delivery" of the first airplane at AirVenture in 2015 ... an airplane that was put on a truck and shipped back to California... their presence at AirVenture 2016 was muted, without so much as a news release a full year later. Statements about the capabilitiues and performance of the company have often been proven to be false and many of the claims made by the company are now viewed with suspicion.

Icon was planning a news conference in Mexico late Thursday to officially announce the construction of the manufacturing plant.

(Image from file)

FMI: /index.cfm?do=main.textpost&id=b3e320db-813f-4832-a5f3-5ee158ea34b8

Advertisement

More News

NTSB Final Report: Evektor-Aerotechnik A S Harmony LSA

Improper Installation Of The Fuel Line That Connected The Fuel Pump To The Four-Way Distributor Analysis: The airplane was on the final leg of a flight to reposition it to its home>[...]

ANN's Daily Aero-Term (09.15.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

Aero-News: Quote of the Day (09.15.25)

“With the arrival of the second B-21 Raider, our flight test campaign gains substantial momentum. We can now expedite critical evaluations of mission systems and weapons capa>[...]

Airborne 09.12.25: Bristell Cert, Jetson ONE Delivery, GAMA Sales Report

Also: Potential Mars Biosignature, Boeing August Deliveries, JetBlue Retires Final E190, Av Safety Awareness Czech plane maker Bristell was awarded its first FAA Type Certification>[...]

Airborne 09.10.25: 1000 Hr B29 Pilot, Airplane Pile-Up, Haitian Restrictions

Also: Commercial A/C Certification, GMR Adds More Bell 429s, Helo Denial, John “Lucky” Luckadoo Flies West CAF’s Col. Mark Novak has accumulated more than 1,000 f>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC