Northrop Adding Mobile Targeting Capability To B-2 Bomber | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.10.24

Airborne-NextGen-06.11.24

Airborne-Unlimited-06.12.24 Airborne-FltTraining-06.13.24

Airborne-Unlimited-06.14.24

Mon, Feb 11, 2008

Northrop Adding Mobile Targeting Capability To B-2 Bomber

Advancements Would Give Spirit Added Teeth

Northrop Grumman told ANN last week the defense contractor is taking the first steps toward giving the B-2 Spirit stealth bomber the ability to destroy moving targets under a current contract with the US Air Force.

Under a one-year, $9.33 million contract, the company has begun preparing the B-2 to carry and deploy small, precision-guided weapons such as the 250-pound class Small Diameter Bomb II (SDB II). The company's work is focused on upgrading the aircraft's current display and weapon interfaces to accommodate this class of weapons. The SDB-II is currently in development and source selection.

"This new Moving Target Kill (MTK) capability is the latest in a series of upgrades defined by the Air Force/Northrop Grumman-led industry team to increase the lethality and fighting effectiveness of the B-2," said Dave Mazur, vice president of Long Range Strike for Northrop Grumman's Integrated Systems sector. "It will allow commanders to deal decisively with an increasingly decentralized and mobile enemy under all weather conditions."

Implementing the MTK capability requires upgrading the B-2's current analog, multi-function cockpit displays and qualifying several of its radar modes to perform the MTK function. Under the current contract, Northrop Grumman is developing and testing a brassboard version of the replacement displays in a laboratory environment. The new systems will be able to display both analog and digital data.

Northrop Grumman has also started planning for the required installation of the Universal Armament Interface (UAI) on the B-2. The UAI is a new "plug and play"-like interface developed by the Air Force to reduce the time and costs required to integrate precision guided weapons on airborne platforms. It standardizes the physical connections and communications protocols used to pass information between an aircraft and the on-board weapons stores.

Full implementation of the UAI will also require upgrading the B-2's display control processor and its stores management processor. Those upgrades are not a part of the current contract.

The MTK capability is the latest in a series of B-2 modernization efforts undertaken by Northrop Grumman and its subcontractors to help the Air Force ensure that the aircraft remains fully capable against evolving threats.

FMI: www.northropgrumman.com

Advertisement

More News

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Aero-News: Quote of the Day (06.12.24)

“The legislation now includes a task force with industry representation ensuring that we have a seat at the table and our voice will be heard as conversations about the futur>[...]

ANN's Daily Aero-Linx (06.12.24)

Aero Linx: Waco Museum The WACO Historical Society, in addition to preserving aviation's past, is also dedicated and actively works to nurture aviation's future through its Learnin>[...]

ANN's Daily Aero-Term (06.12.24): Adcock Range

Adcock Range National low-frequency radio navigation system (c.1930-c.1950) replaced by an omnirange (VOR) system. It consisted of four segmented quadrants broadcasting Morse Code >[...]

Airborne Affordable Flyers 06.06.24: 200th ALTO, Rotax SB, Risen 916iSV

Also: uAvionix AV-Link, Does Simming Make Better Pilots?, World Games, AMA National Fun Fly Czech sportplane manufacturer Direct Fly has finished delivering its 200th ALTO NG, the >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC