Government Wins Case on Cancelled Navy Contract for A-12 Stealth Attack Aircraft | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.01.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-12.03.25

Airborne-FltTraining-12.04.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Mon, May 07, 2007

Government Wins Case on Cancelled Navy Contract for A-12 Stealth Attack Aircraft

Someone Owes Uncle Sam A LOT Of Moolah

The US Court of Federal Claims has upheld the Navy's termination for default of a contract with McDonnell Douglas and General Dynamics for the A-12 stealth attack aircraft.

In 1988, the Navy awarded the $4 billion fixed-price contract for development of the A-12, which was to be a stealthy, carrier-based attack aircraft. The program encountered serious technical difficulties, and in 1991, then Secretary of Defense Dick Cheney terminated the A-12 program because it was substantially over budget and behind schedule. The Navy subsequently terminated the contract for default, without ever receiving a single plane.

The contractors challenged the termination, resulting in 16 years of litigation. The court originally overturned the termination, holding that then Secretary of Defense Cheney had wrongfully terminated the A-12 program over the Navy's objections. Following two appeals, the court held that the Navy had properly terminated the contract for default.

"We are gratified by the court's decision, which explains why the Navy was within its rights to terminate the contract for default and protect the American taxpayer's interests, and hopefully will bring this long litigation closer to resolution," said Deputy Assistant Attorney General Michael F. Hertz.

Unless the judgement is overturned on appeal, the contractors will be required to return to the government payments of about $1.35 billion, plus interest, a sum which currently exceeds $2.6 billion.

FMI: www.usdoj.gov

Advertisement

More News

ANN's Daily Aero-Term (12.04.25): Cooperative Surveillance

Cooperative Surveillance Any surveillance system, such as secondary surveillance radar (SSR), wide-area multilateration (WAM), or ADS-B, that is dependent upon the presence of cert>[...]

ANN's Daily Aero-Linx (12.04.25)

Aero Linx: OX5 Aviation Pioneers Incorporated in 1955 as a Pa 501 (c)(3) Not for Profit Corporation, the OX5 Aviation Pioneers is dedicated to bringing before the public the accomp>[...]

NTSB Prelim: Extra Flugzeugproduktions EA 300/SC

The Pilot Appeared To Regain Control After Six Rotations And Attempted To “Fly Out” Inverted But Had Insufficient Altitude On November 8, 2025, at 1038 eastern standard>[...]

Classic Aero-TV: The Bally Bomber - The All Time Ultimate Warbird Replica?

From 2018 (YouTube Edition): Aero-News Talks With The Airplane's Builder One of the many unique airplanes at AirVenture 2018 was a 1/3-scale B-17 bomber built by Jack Bally, who ta>[...]

ANN's Daily Aero-Linx (12.05.25)

Aero Linx: Society of U.S. Army Flight Surgeons (SoUSAFS) The Society of US Army Flight Surgeons (SoUSAFS) serves to advance the science and art of Aerospace Medicine and its allie>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC