Rectrix MRO Completes Rockwell Collins Proline 21 Advanced Upgrade Installation | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Mon, Jun 25, 2018

Rectrix MRO Completes Rockwell Collins Proline 21 Advanced Upgrade Installation

Makes Aircraft Compliant With 2020 ADS-B Equipage Deadline

Rectrix MRO, Inc., an FAA Part 145 Repair Station located at Westfield-Barnes Regional Airport (KBAF), recently completed a Rockwell Collins ProLine 21 Advanced upgrade installation for a customer’s Bombardier Challenger 300 with a flawless operational check flight following the aircraft’s release. The complex upgrade makes the aircraft compliant with upcoming FAA NextGen avionics requirements and updates the avionics suite to the latest technology available for that airframe.

During the Proline 21 Advanced installation, Rectrix MRO also outfitted the aircraft with a new dual IFIS system, ADS-B Out, FANs 1A+ over Iridium Datalink, Remote Database dataloader, cabin refurbishment, and a 12/24/48 month inspection.

“This project, essentially the complete removal and installation of all new flight control, guidance, and communication systems demonstrates the technical expertise and breadth of capabilities available at Rectrix MRO,” said Kevin Bradley, Rectrix Vice President of Operations.

“With NextGen deadlines fast approaching, aircraft owners must take steps to prepare their older aircraft to meet the FAA requirements,” said Sherry Talbert, Rectrix MRO Director of Maintenance. “We were pleased to complete this work on time and within budget and are proud to say that the test flight went flawlessly with zero squawks, a true testament to the capabilities of the maintenance team.”

The FAA’s ADS-B requirements for all aircraft flying in controlled airspace go into effect January 1, 2020. ADS-B requirements will take effect in Europe June 7, 2020. Last year Rectrix MRO expanded its services for Rockwell Collins-equipped aircraft and today Rectrix MRO can service nearly every avionics need of most business and regional aircraft.

(Source: Rectrix MRO news release. Images provided)

FMI: rectrix.aero

Advertisement

More News

NTSB Final Report: Douglas A-4K

Pilot Applied Full Aft Stick And Nose-Up Trim, But The Airplane Remained On The Runway Analysis: The pilot reported that a preflight inspection and flight control checks revealed n>[...]

ANN FAQ: Q&A 101

A Few Questions AND Answers To Help You Get MORE Out of ANN! 1) I forgot my password. How do I find it? 1) Easy... click here and give us your e-mail address--we'll send it to you >[...]

Classic Aero-TV: PBY Catalina--From Wartime to Double Sunrise to the Long Sunset

From 2022 (YouTube Edition): Before They’re All Gone... Humankind has been messing about in airplanes for almost 120-years. In that time, thousands of aircraft representing i>[...]

ANN's Daily Aero-Term (07.01.25): Advanced Air Mobility (AAM)

Advanced Air Mobility (AAM) A transportation system that transports people and property by air between two points in the NAS using aircraft with advanced technologies, including el>[...]

ANN's Daily Aero-Linx (07.01.25)

Aero Linx: MQ-1B Predator The MQ-1B Predator is an armed, multi-mission, medium-altitude, long-endurance remotely piloted aircraft that is employed primarily as an intelligence-col>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC