Government Accountability Office Warns KC-46 Pegasus Program | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.19.25

Airborne-NextGen-05.20.25

AirborneUnlimited-05.21.25

Airborne-AffordableFlyers-05.22.25

AirborneUnlimited-05.23.25

Sat, Jan 29, 2022

Government Accountability Office Warns KC-46 Pegasus Program

USAF Told to Let Systems Mature Before Going All-In On Expensive, Unrefined Systems

The US Air Force has been warned of re-treading mistaken ground in their troubled KC-46 Pegasus tanker program, being warned against accepting a redesign of its floundering Remote Vision System without taking appropriate precautions against waste, said the GAO. 

The plan as-is essentially places the USAF on the hook for increased financial responsibility as it commits to the new design of the marginally functional system before the technology involved is adequately developed. The accountability office recommends the force fully assess and test the technology involved, and keep an open mind towards waiting for more maturation and engineering to take place before rolling out a half-baked system across a large swathe of its tanker fleet. 

 

The Remote Vision System is another futuristic whiz-bang system that refines the boom refueling system with cameras, displays, and monitors with an eye towards more accurate, all-weather, day and night refueling capability. Operations in the dark or in poor visibility would, just like many other instrument flight operations, benefit greatly from the ability to see and assess refueling ports more easily. The system is, of course, in modern fashion, vital to refueling, as the boom operator's station has been eliminated in favor of a crew station in the main cabin. Previous tankers placed an airman face down with a window view of his refueling target, a luxury no longer available on the Pegasus. The result, should the system be built en masse and delivered to tanker wings around the world, would likely lead to only marginal mission readiness until the issues could be addressed and shortcomings resolved. Concurrent production and development often brings, as the GAO notes, the liability of increased cost over time. Outstanding RVS issues, as of last year, were slated to be resolved sometime in 2024 at the earliest, with sundry other items with the refueling boom and flight management system in the years leading up to it. 

"Without taking these steps prior to closing the preliminary design review, the program may accept a remote vision system design that contains immature technologies and greater risk of cost and schedule growth. The sooner the program completes these steps, even if after the design review, the sooner it can identify design issues and proactively take steps to mitigate any further cost growth and delays in delivering promised capability to the warfighter." 

"GAO is making three recommendations including that, prior to approving the contractor's redesign of the remote vision system, or soon thereafter, the Air Force assess technology readiness, develop a technology maturation plan, and test the prototype in an operational environment." The Air Force, the GAO notes, "did not concur with these recommendations." 

FMI: www.gao.gov

Advertisement

More News

Oshkosh Memories: An Aero-News Stringer Perspective

From 2021: The Inside Skinny On What Being An ANN Oshkosh Stringer Is All About By ANN Senior Stringer Extraordinare, Gene Yarbrough The annual gathering at Oshkosh is a right of p>[...]

NTSB Prelim: Piper PA32RT

Video Showed That During The Takeoff, The Nose Baggage Door Was Open On May 10, 2025, about 0935 eastern daylight time, a Piper PA-32RT-300, N30689, was destroyed when it was invol>[...]

ANN FAQ: Follow Us On Instagram!

Get The Latest in Aviation News NOW on Instagram Are you on Instagram yet? It's been around for a few years, quietly picking up traction mostly thanks to everybody's new obsession >[...]

Aero-News: Quote of the Day (05.28.25)

"I think what is key, we have offered a bonus to air traffic controllers who are eligible to retire. We are going to pay them a 20% bonus on their salary to stay longer. Don't reti>[...]

ANN's Daily Aero-Term (05.28.25): Pilot Briefing

Aero Linx: Pilot Briefing The gathering, translation, interpretation, and summarization of weather and aeronautical information into a form usable by the pilot or flight supervisor>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC