Typhoon Hits Unusual Milestone | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.19.25

Airborne-NextGen-05.20.25

AirborneUnlimited-05.21.25

Airborne-AffordableFlyers-05.22.25

AirborneUnlimited-05.23.25

Fri, Mar 16, 2012

Typhoon Hits Unusual Milestone

Test Airplane Has 'Flown' Further Than Any Of Its Type ... And Never Left The Ground

Typhoon has completed 11,000 hours in a special BAE Systems test-rig. Tailor-made for the aircraft, the rig is located in Brough in the North East of England, and can simulate the most demanding conditions Typhoon is ever likely to encounter. Using the test facility is a vital part of securing flight-clearances for the aircraft as it notches up thousands of hours in service in the air. The vital ground-testing ensures the airframe is safe and retains its full performance capability even though it has many missions behind it.

Engineers at BAE Systems have developed the test-rig to monitor the stresses and strains put on the aircraft as special hydraulic rams apply loads to the Typhoon across more than 100 pressure-points. The reactions to these stresses are then measured over thousands of special monitoring channels to assess exactly how the plane is reacting over time. Within the next few weeks the aircraft in the test-rig will have completed 12,000 hours of 'flying' which will mean Typhoons in service will gain clearance for 4,000 hours in the air.

The aircraft’s production specification dictates a ratio of three to one for ground-based tested versus air-based flying. The testing is expect to run for a full three years by which time the Typhoon that never turns a wheel will have 'flown' for 18,000 hours clearing the way for hundreds of Typhoon aircraft around the world to be certified for 6,000 hours of flying.

FMI: www.baesystems.com

Advertisement

More News

ANN's Daily Aero-Term (05.29.25): Terminal Radar Service Area

Terminal Radar Service Area Airspace surrounding designated airports wherein ATC provides radar vectoring, sequencing, and separation on a full-time basis for all IFR and participa>[...]

ANN's Daily Aero-Term (05.30.25): Very High Frequency (VHF)

Very High Frequency (VHF) The frequency band between 30 and 300 MHz. Portions of this band, 108 to 118 MHz, are used for certain NAVAIDs; 118 to 136 MHz are used for civil air/grou>[...]

Aero-News: Quote of the Day (05.30.25)

“From approximately November 2021 through January 2022, Britton-Harr, acting on behalf of AeroVanti, entered into lease-purchase agreements for five Piaggio-manufactured airc>[...]

Airborne 05.23.25: Global 8000, Qatar B747 Accepted, Aviation Merit Badge

Also: Virtual FLRAA Prototype, IFR-Capable Autonomous A/C, NS-32 Crew, Golden Dome Missile Defense Bombardier announced that the first production Global 8000 successfully completed>[...]

ANN's Daily Aero-Linx (05.30.25)

Aero Linx: The 1-26 Association (Schweizer) The Association’s goal is to foster the helpfulness, the camaraderie, and the opportunity for head-to-head competition that is fou>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC