Boosters For Orion's Launch Vehicle Arrive At Cape Canaveral | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Sat, Mar 08, 2014

Boosters For Orion's Launch Vehicle Arrive At Cape Canaveral

Team Progressing Toward Exploration Flight Test-1

The Orion spacecraft has moved another step closer toward its first test flight as the core and starboard boosters for the United Launch Alliance (ULA) Delta IV Heavy rocket contracted by Lockheed Martin for that flight have arrived at Cape Canaveral Air Force Station. The rocket will undergo testing and processing at ULA's Horizontal Integration Facility to prepare for Orion's Exploration Flight Test-1 later this year.

Technicians offloaded the boosters from a specially designed ship called the Delta Mariner, which had traveled 8 days to Florida from the ULA facility in Decatur, AL. where the rocket is manufactured. Once in the Horizontal Integration Facility, processing and testing will be completed in preparation for rolling the Delta IV Heavy out to Space Launch Complex 37 for launch.

During Orion's test flight, the uncrewed spacecraft will launch on the Delta IV Heavy and will travel 3,600 miles beyond low Earth orbit. That same day, Orion will return to Earth at a speed of approximately 20,000 mph for a splashdown in the Pacific Ocean. EFT-1 will provide engineers with critical data about Orion's heat shield, flight systems, and capabilities to validate designs of the spacecraft before it begins carrying humans to new destinations in deep space.

(Image provided by Lockheed Martin)

FMI: www.lockheedmartin.com, www.nasa.gov

Advertisement

More News

Aero-News: Quote of the Day (07.11.25)

“Honored to accept this mission. Time to take over space. Let’s launch.” Source: SecTrans Sean Duffy commenting after President Donald Trump appointed U.S. Secret>[...]

ANN's Daily Aero-Term (07.11.25): Permanent Echo

Permanent Echo Radar signals reflected from fixed objects on the earth's surface; e.g., buildings, towers, terrain. Permanent echoes are distinguished from “ground clutter&rd>[...]

ANN's Daily Aero-Linx (07.11.25)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

NTSB Final Report: Schweizer SGS 2-33A

Glider Encountered A Loss Of Lift And There Was Not Sufficient Altitude To Reach The Airport Analysis: The flight instructor reported that while turning final, the glider encounter>[...]

NTSB Prelim: Aeronca 7AC

Airplane Climbed To 100 Ft Above Ground Level, At Which Time The Airplane Experienced A Total Loss Of Engine Power On May 24, 2025, at 1300 eastern daylight time, an Aeronca 7AC, N>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC