Spaceport America Runway Begins To Take Shape In NM | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Mon, Feb 22, 2010

Spaceport America Runway Begins To Take Shape In NM

Commercial Spaceport Will Have 10,000 Feet Of Concrete

The first batch of concrete was poured Thursday, February 11, marking the start of the final concrete finish phase of the runway construction at Spaceport America, the world's first purposebuilt commercial spaceport.  The runway project, which began in August 2009, is expected to be completed this summer, according to the New Mexico Spaceport Authority (NMSA).

The multi-layered runway is made up of 24 inches of prepared subgrade with the top six inches being a soil-cement mix foundation, followed by four inches of asphalt, and finally a 14-inch finish layer of concrete. Measuring 10,000 feet long by 200 feet wide, the runway is designed to support nearly every aircraft in the world, as well as the day-to-day space tourism and payload launch operations like those for Virgin Galactic's WhiteKnightTwo and SpaceShipTwo.

The large concrete runway will accommodate returning launch vehicles, fly-back rocket boosters and other space launch and training vehicles.


Photo Credit: Judd Bradley / Spaceport America

"The beginning of the concrete application to the runway marks a significant milestone in the realization of Spaceport America and commercial space in New Mexico," commented Steve Landeene, Spaceport America's Executive Director.  "The airfield lies strategically within the White Sands Missile Range restricted airspace call-up area, which provides a unique opportunity for customers to fly in either the national airspace system or full restricted zone, depending on the mission requirements."

Along with the runway project, work is proceeding on the 110,000-square foot Terminal Hangar Facility (THF) at Spaceport America.  The NMSA has been working closely with leading aerospace firms such as Virgin Galactic, Lockheed Martin, Moog-FTS, and UP Aerospace to develop commercial spaceflight at the new facility.

FMI: www.spaceportamerica.com

Advertisement

More News

ANN's Daily Aero-Term (05.05.25): Circle To Runway (Runway Number)

Circle To Runway (Runway Number) Used by ATC to inform the pilot that he/she must circle to land because the runway in use is other than the runway aligned with the instrument appr>[...]

ANN's Daily Aero-Linx (05.05.25)

Aero Linx: National Aviation Safety Foundation (NASF) The National Aviation Safety Foundation is a support group whose objective is to enhance aviation safety through educational p>[...]

NTSB Prelim: De Havilland DHC-1

At Altitude Of About 250-300 Ft Agl, The Airplane Experienced A Total Loss Of Engine Power On November 6, 2024, at 1600 central standard time, a De Havilland DHC-1, N420TD, was inv>[...]

Classic Aero-TV: The Boeing Dreamliner -- Historic First Flight Coverage

From 2009 (YouTube Edition): Three Hour Flight Was 'Flawless' -- At Least, Until Mother Nature Intervened For anyone who loves the aviation business, this was a VERY good day. Afte>[...]

Airborne-NextGen 05.06.25: AF Uncrewed Fighters, Drones v Planes, Joby Crew Test

Also: AMA Names Tyler Dobbs, More Falcon 9 Ops, Firefly Launch Unsuccessful, Autonomous F-16s The Air Force has begun ground testing a future uncrewed jet design in a milestone tow>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC