Boeing Receives $1.49 Billion Contract For 13 P-8A Poseidons | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.28.25

Airborne-NextGen-04.29.25

AirborneUnlimited-04.30.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Tue, Sep 01, 2015

Boeing Receives $1.49 Billion Contract For 13 P-8A Poseidons

US Navy Orders 2nd Full-Rate Production Lot Including First Aircraft For Australia

Boeing will provide the first P-8A Poseidon maritime surveillance aircraft for Australia and additional P-8As for the U.S. Navy following a $1.49 billion contract award from the Navy for 13 aircraft.

The order includes nine aircraft for the U.S. Navy and four Poseidon aircraft for the Royal Australian Air Force (RAAF), a long-time partner to the U.S. Navy on P-8A development.

“By working together since the early stages of P-8A development , the U.S. and Australia have created one airplane configuration that serves the needs of both countries,” said Capt. Scott Dillon, U.S. Navy P-8 program manager. “The U.S. and Australian P-8As will be able to operate with each other effectively and affordably for decades to come.”

This latest award puts Boeing on contract to build the Navy’s second lot of full-rate production aircraft, bringing the U.S. Navy’s fleet total to 62 P-8As. Boeing has delivered 28 Poseidons to date.

“Delivering premier aircraft on schedule and on cost has become a hallmark of the P-8 program,” said James Dodd, Boeing vice president and general manager of Mobility, Surveillance and Engagement. “We look forward to building on Boeing’s long-standing relationship with Australia by providing the quality, value and capability of the P-8A.”

Based on Boeing’s Next-Generation 737-800 commercial airplane, the P-8A offers the worlds’ most advanced anti-submarine, anti-surface warfare and intelligence, surveillance and reconnaissance capabilities. The Navy has deployed the first two P-8A patrol squadrons since operations started in 2013.

Australia’s participation in the P-8 program began in 2009 when the government signed the first in a series of memorandums of understanding to work with the U.S. Navy on system design and development. The U.S. Navy and the RAAF also established a joint program office that operates at Naval Air Station Patuxent River, Md.

Production of the first Australian P-8A will begin later this year, with delivery to the RAAF scheduled for 2016. Boeing will also provide the RAAF with a complete training system for the P-8A, using simulators to train pilots and mission crews to operate the aircraft, its sensors, communications and weapons systems without relying on costly live flights.

(Image provided by Boeing)

FMI: www.boeing.com

Advertisement

More News

NTSB Final Report: Cozy Cub

Witness Reported The Airplane Was Flying Low And Was In A Left Bank When It Struck The Power Line Analysis: The pilot was on final approach to land when the airplane collided with >[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

Classic Aero-TV: Seated On The Edge Of Forever -- A PPC's Bird's Eye View

From 2012 (YouTube Edition): A Segment Of The Sport Aviation World That Truly Lives "Low And Slow" Pity the life of ANN's Chief videographer, Nathan Cremisino... shoot the most exc>[...]

ANN's Daily Aero-Linx (04.29.25)

Aero Linx: International Business Aviation Council (IBAC) IBAC promotes the growth of business aviation, benefiting all sectors of its industry and in all regions of the world. As >[...]

ANN's Daily Aero-Term (04.29.25): Execute Missed Approach

Execute Missed Approach Instructions issued to a pilot making an instrument approach which means continue inbound to the missed approach point and execute the missed approach proce>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC