NASA Releases Initial Requirements for ISS Shuttle | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Fri, Feb 21, 2003

NASA Releases Initial Requirements for ISS Shuttle

NASA released the top level requirements for the Orbital Space Plane this week. The new ship would be the first of a next-generation system of space vehicles designed to provide a crew rescue and crew transport capability to and from the International Space Station. These requirements set the foundation for the design of the vehicle and its associated systems.

The Level I requirements for an Orbital Space Plane system were developed based on NASA's missions as defined in the Integrated Space Transportation Plan and inputs from the industry and Department of Defense partners participating in the program. The requirements were reviewed at multiple levels within the agency. The final review and approval process included the NASA Administrator, Deputy Administrator, as well as the Associate Administrators for the Office of Aerospace Technology and the Office of Human Space Flight.

"This is an important first step in making the Integrated Space Transportation Plan a reality," said NASA Deputy Administrator Frederick Gregory. "The Orbital Space Plane system will give us the flexibility needed to safely and efficiently get crew to and from orbit and to provide crew rescue and logistical support to the International Space Station. These initial requirements help to outline a comprehensive system that will significantly complement the capabilities of our existing Space Shuttle fleet."

Any future changes to the Level I Requirements would be considered by the Orbital Space Plane Program Office and require approval from the NASA Executive Council.

The program now is in the process of developing Level II Requirements for the Orbital Space Plane system. Unlike the Level I requirements, which were defined by NASA, Level II requirements will be defined at the program level and will be detailed in a document referred to as the Systems Requirements Document (SRD) planned for release no later than late this year.

FMI: www.nasa.gov/missions/current/MI_FM_osp.html

Advertisement

More News

NTSB Final Report: Rutan Long-EZ

He Attempted To Restart The Engine Three Times. On The Third Restart Attempt, He Noticed That Flames Were Coming Out From The Right Wing Near The Fuel Cap Analysis: The pilot repor>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

Classic Aero-TV: ICAS Perspectives - Advice for New Air Show Performers

From 2009 (YouTube Edition): Leading Air Show Performers Give Their Best Advice for Newcomers On December 6th through December 9th, the Paris Las Vegas Hotel hosted over 1,500 air >[...]

ANN's Daily Aero-Linx (06.28.25)

Aero Linx: NASA ASRS ASRS captures confidential reports, analyzes the resulting aviation safety data, and disseminates vital information to the aviation community. The ASRS is an i>[...]

Aero-News: Quote of the Day (06.28.25)

“For our inaugural Pylon Racing Seminar in Roswell, we were thrilled to certify 60 pilots across our six closed-course pylon race classes. Not only did this year’s PRS >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC