Airbus Hits New Record Aircraft Deliveries In 2010 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.15.25

AirborneNextGen-
09.09.25

Airborne-Unlimited-09.10.25

Airborne-AffordableFlyers-09.11.25

AirborneUnlimited-09.12.25

Tue, Jan 18, 2011

Airbus Hits New Record Aircraft Deliveries In 2010

Orders Exceed Planemaker's Expectations, Including 32 A380s

The European planemaker Airbus says 2010 was a record year for deliveries of aircraft, with 510 commercial aircraft handed over to 94 customers, 19 of which were new. Deliveries included 401 A320 Family aircraft, 91 A330/A340s and 18 A380s. In its military division, Airbus delivered 20 light and medium military and transport aircraft (CN235 and C295), exceeding the 2009 figure by four aircraft.

Airbus booked 644 commercial aircraft orders (574 net) in 2010. The value of the new orders surpassed $84 billion gross ($74 billion net) at list prices. This represents 51 per cent by units of the 2010 gross worldwide market share of aircraft beyond 100 seats. Airbus won 21 new orders for its military aircraft, the CN235 and C295.

The new commercial orders include 452 A320 Family aircraft, 160 A330/A340/A350 XWB Family aircraft, and 32 new orders for the A380. At 2010 year end, Airbus’ commercial order book backlog was 3,552 aircraft valued at over US$480 billion at list prices, or equalling six years of full production. The military backlog stood at 247 aircraft.


A320neo

Airbus also launched the A320neo (new engine option) in 2010, which is estimated to burn 15 per cent less fuel. That would be equivalent to a saving of up to 3,600 tonnes of CO2 emissions per aircraft per year. 

Total orders for the A350 XWB climbed to 583, and number of customers to 36, by year end. On the industrial side, 2010 saw the start of manufacturing of the first A350 XWB components and sub assemblies at section level. The systems test rig (Iron Bird) for the A350 XWB started operations in December.


A400M

The A400M program is delivering results with four development aircraft flying. It accomplished more than 1,000 flight hours in over 300 test flights. Start of A400M series production is imminent and civil certification is planned to be obtained before the end of the year. The A330-based Multi-Role Tanker Transport (MRTT) aircraft achieved civil and military certification in 2010. Five are flying with a further four undergoing conversion. Delivery of the first two MRTTs to the Royal Australian Air Force (RAAF) is in the final stages. 

The company says that progress in the A380 program has allowed the company to reduce the temporary workforce considerably. However, hundreds of temporary positions were turned into full-time Airbus contracts creating a large number of new jobs in particular in Engineering and Production. In 2010, Airbus recruited 2,200 new employees, bringing the active workforce up to 52,500 by year end. For 2011 it is planned to hire up to 3,000 people, in particular for the ramp-up of the single aisle and long range programmes as well as development and industrialisation of the A400M, A350 XWB and the A320neo.


A380

"2010 was a good year, in fact better than expected twelve months ago. The market rebound and improved programme performance has been particularly encouraging. However, with plenty of challenges, especially in our development programmes, we’ll have to work hard to further improve and also make 2011 a successful year for Airbus,” said Tom Enders, Airbus President and CEO. 

Also in 2010, Airbus played a role in the commercialization of alternative fuels by establishing the first value chain in Brazil, bringing together farmers, refiners and airlines. Airbus completed Latin America’s first bio-fuel flight, and Airbus is also supporting the world’s first scheduled daily bio-fuel passenger flights due to begin in 2011. This underlines Airbus strategy to advance from demonstration flights towards the commercialization of alternative fuels for aviation. 

FMI: www.airbus.com

Advertisement

More News

NTSB Final Report: Evektor-Aerotechnik A S Harmony LSA

Improper Installation Of The Fuel Line That Connected The Fuel Pump To The Four-Way Distributor Analysis: The airplane was on the final leg of a flight to reposition it to its home>[...]

ANN's Daily Aero-Term (09.15.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

Aero-News: Quote of the Day (09.15.25)

“With the arrival of the second B-21 Raider, our flight test campaign gains substantial momentum. We can now expedite critical evaluations of mission systems and weapons capa>[...]

Airborne 09.12.25: Bristell Cert, Jetson ONE Delivery, GAMA Sales Report

Also: Potential Mars Biosignature, Boeing August Deliveries, JetBlue Retires Final E190, Av Safety Awareness Czech plane maker Bristell was awarded its first FAA Type Certification>[...]

Airborne 09.10.25: 1000 Hr B29 Pilot, Airplane Pile-Up, Haitian Restrictions

Also: Commercial A/C Certification, GMR Adds More Bell 429s, Helo Denial, John “Lucky” Luckadoo Flies West CAF’s Col. Mark Novak has accumulated more than 1,000 f>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC