FAA Releases Cirrus SR22 Manual Supplement | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Mon, Jul 20, 2009

FAA Releases Cirrus SR22 Manual Supplement

Provides Guidelines For Electrical System Malfunction

The FAA has published a supplement to the Cirrus SR22 operators manual that provides the necessary guidance for electrical load shedding in the event of the primary electrical generating source failure in accordance with § 135.163(f)(2). The supplemental document outlines emergency procedures in the event the pilot sees a steady Alt 1 light on the panel, indicating an alternator failure.

For aircraft serials with Avidyne PFD/MFD Avionics:
  • Steady illumination indicates failure of alternator 1. Attempt to restore alternator. If alternator cannot be restored, it will be necessary to divert the flight to land within one hour.
  • Loads on Main Buses, Non-essential Buses, and Air-conditioning Buses must be reduced and available equipment on these buses managed as necessary for flight conditions. Equipment essential for continued safe flight and landing will be powered by Alternator 2 and Battery 2 through the Essential Buses. However, depending upon flight conditions, additional equipment is required.

A step-by-step list of procedures follows those general instructions. For 14 CFR 135 Operations, FAA says the load shedding and equipment management in the published procedure will provide at least one-hour operating time on aircraft with a fully charged, 13.6 amp-hour battery (available from Cirrus Design Spare Parts Sales) in good condition for equipment required for emergency operation under 14 CFR 135.163(f), and meets the requirements of that paragraph. The document instructs the pilot to replan the flight for a landing as soon as practical (within one hour) at a landing field with visual minimums. It says landing speed should be increased 10 KIAS for flaps up and landing lights should not be used.

For aircraft serials with Perspective PFD/MFD Avionics:
  • Steady illumination indicates failure of alternator 1. Attempt to restore alternator. If alternator cannot be restored, Alternator 2, and Bat 2 will provide sufficient electrical power to supply all requirements for emergency operation of equipment indefinitely as is required by 14 CFR 135.163(f).

And again, there are detailed instructions. FAA says when the Cirrus Design SR22 aircraft is being operated under the provisions 14 CFR 135, the Supplement is applicable and must be inserted in the Supplements section (Section 9) of the Cirrus Design SR22 Pilot's Operating Handbook (Handbook).

FAA says the information in the Supplement adds to, supersedes, or deletes information in the basic handbook.

This is in no way the complete list of instructions included in the 6 page supplement. ANN of course encourages SR22 pilots to familiarize themselves with the complete document as issued by the FAA, and keep it in your airplane if required.

FMI: http://www.faa.gov/

Advertisement

More News

Aero-News: Quote of the Day (11.17.25)

“We achieved full mission success today, and I am so proud of the team. It turns out Never Tell Me The Odds had perfect odds—never before in history has a booster this >[...]

ANN's Daily Aero-Term (11.17.25): NonDirectional Beacon

NonDirectional Beacon An L/MF or UHF radio beacon transmitting nondirectional signals whereby the pilot of an aircraft equipped with direction finding equipment can determine his/h>[...]

NTSB Final Report: Fred L Wellman CH 750 Cruzer

About 5ft Above Ground Level, The Airplane Stalled, And The Left Wing Dropped Analysis: The pilot reported that this flight was conducted as part of phase 1 flight testing of the n>[...]

ANN's Daily Aero-Linx (11.17.25)

Aero Linx: Brodhead Pietenpol Association The Brodhead Pietenpol Association is a newly reorganized (in 2017) non-profit educational corporation that grew and developed from an ear>[...]

Airborne-NextGen 11.11.25: Archer Buys Hawthorne, Joby Conforms, Stranded Astros

Also: VerdeGo Contract, Medi-Carrier, Gambit 6 UCAV, Blade Urban Air Mobility Pilot Archer Aviation has inked a deal for control of Hawthorne Municipal Airport (HHR), also known as>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC