Joby Successfully Completes TIA Test Flight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.19.25

Airborne-NextGen-05.20.25

AirborneUnlimited-05.21.25

Airborne-AffordableFlyers-05.22.25

AirborneUnlimited-05.23.25

Wed, Dec 25, 2024

Joby Successfully Completes TIA Test Flight

Begins Final Phase of Certification Prior To Commercial Service

Joby Aviation announced the successful completion of the first flight test under the Type Inspection Authorization (TIA) involving FAA pilots evaluating human factors elements of flight safety using an FAA-conforming flight deck in a Joby simulator.

TIA testing is considered the final phase of the type certification process that leads to the aircraft beginning commercial passenger service. The FAA pilots conduct the testing to validate the aircraft’s performance and safety in accordance with the previously-approved test plans.

JoeBen Bevirt, CEO and Founder of Joby Aviation said, “This milestone demonstrates Joby’s continued industry leadership and is a reflection of the maturity of our test program and the rigorous company testing we’ve already completed. As well as continuing the ‘for credit’ testing of components, aerostructures and systems that is already underway, we are targeting the start of TIA flight testing in 2025 with our first FAA-conforming aircraft, which is currently being built at our facility in Marina, California.”

The tests are conducted under a set of criteria the FAA specifies in an approved human factors test plan that measures pilot workload under various flight conditions that are expected during actual operations. They also test the physical ergonomics of the flight deck and other human factors aspects of aircraft safety.

During this session, the FAA pilots completed three days of testing. Flight testing under TIA in the actual aircraft is slated for as early as January 2025.

FMI:  www.jobyaviation.com/

Advertisement

More News

ANN's Daily Aero-Term (05.29.25): Terminal Radar Service Area

Terminal Radar Service Area Airspace surrounding designated airports wherein ATC provides radar vectoring, sequencing, and separation on a full-time basis for all IFR and participa>[...]

ANN's Daily Aero-Term (05.30.25): Very High Frequency (VHF)

Very High Frequency (VHF) The frequency band between 30 and 300 MHz. Portions of this band, 108 to 118 MHz, are used for certain NAVAIDs; 118 to 136 MHz are used for civil air/grou>[...]

Aero-News: Quote of the Day (05.30.25)

“From approximately November 2021 through January 2022, Britton-Harr, acting on behalf of AeroVanti, entered into lease-purchase agreements for five Piaggio-manufactured airc>[...]

Airborne 05.23.25: Global 8000, Qatar B747 Accepted, Aviation Merit Badge

Also: Virtual FLRAA Prototype, IFR-Capable Autonomous A/C, NS-32 Crew, Golden Dome Missile Defense Bombardier announced that the first production Global 8000 successfully completed>[...]

ANN's Daily Aero-Linx (05.30.25)

Aero Linx: The 1-26 Association (Schweizer) The Association’s goal is to foster the helpfulness, the camaraderie, and the opportunity for head-to-head competition that is fou>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC