Utilicraft Aerospace Industries, M7 Aerospace Sign Agreement | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Wed, Sep 19, 2007

Utilicraft Aerospace Industries, M7 Aerospace Sign Agreement

Firms Will Work To Develop FF-1080 Freighter Prototype

Utilicraft Aerospace Industries of Albuquerque, NM tells ANN it has contracted with M7 Aerospace LP for the design and development of the pre-production prototype wing and powerplant installation for Utilicraft's fledgling FF-1080 Freight Feeder aircraft. 

The FF-1080-200 is a high-wing, twin-engine turboprop aircraft designed to carry eight fully loaded LD3 cargo containers for a distance of 500 nautical miles. Lighter loads can be carried distances up to 2,000 nautical miles, although the aircraft is primarily intended for use in the short haul feeder role for large volume package carriers.

M7's Engineering Division has begun designing attachments and interface of the Pratt & Whitney PW-127G engines and nacelles to the existing prototype wing center section. Fuselage design and tooling is underway at Utilicraft and Metalcraft Technologies Inc.

Utilicraft currently has orders and options for 25 FF-1080-200s. The aircraft is designed to have short takeoff and landing (STOL) capability, to operate from airfields with less than 3,500 feet of available runway.

"We are pleased to be associated with the development of this exciting new product that brings so much value to the air cargo industry," said Joe Furnish, vice president of M7's Engineering Division. 

M7's Engineering Division provides a wide variety of engineering services to M7 Aerospace, its customers, and other organizations or individuals requiring design, analysis or test procedures.

M7's engineering team has certified aircraft and systems to requirements of the US Federal Aviation Administration, the European Aviation Safety Agency (EASA), and other foreign certification agencies, spanning the requirements of FAR 23, 25, 27, 29 and their European equivalents.  The team is familiar with both fixed- and rotary-wing aircraft.

Utilicraft plans to have the FF-1080 certified to FAA Part 25 requirements.

FMI: www.m7aerospace.com, www.utilicraft.com

Advertisement

More News

ANN's Daily Aero-Term (11.16.25): NonApproach Control Tower

NonApproach Control Tower Authorizes aircraft to land or takeoff at the airport controlled by the tower or to transit the Class D airspace. The primary function of a nonapproach co>[...]

Aero-News: Quote of the Day (11.16.25)

“This shutdown inflicted real damage. Beyond disrupting operations and adding risk into the aviation system… it hindered essential career growth opportunities and stal>[...]

ANN's Daily Aero-Linx (11.16.25)

Aero Linx: The Mooney Mite Site Dedicated to the Mooney M-18 Mite, "The Most Personal Airplane," and to supporting Mite owners everywhere. The Mooney M-18 Mite is a single-place, l>[...]

NTSB Final Report: Vans Aircraft Inc RV-12

Pilot’s Improper Installation Of The Control Stick Pushrod Assemblies, Which Resulted In Separation Of The Left Pushrod And A Total Loss Of Roll Control Analysis: While retur>[...]

ANN FAQ: How Do I Become A News Spy?

We're Everywhere... Thanks To You! Even with the vast resources and incredibly far-reaching scope of the Aero-News Network, every now and then a story that should be reported on sl>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC