Aero-TV: CJ4 Precision Assembly Pt. 1 – Cessna’s Fuselage Build Process | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Tue, Feb 16, 2010

Aero-TV: CJ4 Precision Assembly Pt. 1 – Cessna’s Fuselage Build Process

CJ4 Program Manager, Norm Baker, Provides an Exclusive Factory Tour

At Cessna Aircraft, “safety begins with a durable airframe.” Each airframe is stress-tested five times the aircraft’s standard lifetime; yet, Cessna’s renowned safety and reliability begins on the production line.

State-of-the-art technology allows employees to create replicable, seamless assembly for each new aircraft on the line. In the first of his four-part series, Baker describes the CJ4’s fuselage build process.

The Citation CJ4 will debut two new dual-channel, FADEC controlled Williams International FJ44-4A engines. The turbofan engines each produce 3,400 pounds of takeoff thrust, allowing the aircraft to takeoff at max weight with as little as 3,300 feet of runway.

After takeoff, the Citation CJ4 is capable of a direct climb to 45,000 feet in just 28 minutes. In addition, the CJ4 will offer increased performance over earlier projections with a maximum cruise speed of more than 450 knots and a maximum range of over 2,000 nautical miles.

On February 2nd, 2010, Cessna announced the completion of all certification testing. Three Citation CJ4 test aircraft completed over 1,100 flights with more than 2,000 flight hours accumulated. With the CJ4 in the final stages of F.A.A. type certification approvals, the company expects deliveries to begin in late 2010.

FMI: www.cessna.com/index.html, www.cessna.com/citation/citation-cj4.html, www.aero-tv.net, www.youtube.com/aerotvnetwork, http://twitter.com/AeroNews

Advertisement

More News

ANN's Daily Aero-Term (05.05.25): Circle To Runway (Runway Number)

Circle To Runway (Runway Number) Used by ATC to inform the pilot that he/she must circle to land because the runway in use is other than the runway aligned with the instrument appr>[...]

ANN's Daily Aero-Linx (05.05.25)

Aero Linx: National Aviation Safety Foundation (NASF) The National Aviation Safety Foundation is a support group whose objective is to enhance aviation safety through educational p>[...]

NTSB Prelim: De Havilland DHC-1

At Altitude Of About 250-300 Ft Agl, The Airplane Experienced A Total Loss Of Engine Power On November 6, 2024, at 1600 central standard time, a De Havilland DHC-1, N420TD, was inv>[...]

Classic Aero-TV: The Boeing Dreamliner -- Historic First Flight Coverage

From 2009 (YouTube Edition): Three Hour Flight Was 'Flawless' -- At Least, Until Mother Nature Intervened For anyone who loves the aviation business, this was a VERY good day. Afte>[...]

Airborne-NextGen 05.06.25: AF Uncrewed Fighters, Drones v Planes, Joby Crew Test

Also: AMA Names Tyler Dobbs, More Falcon 9 Ops, Firefly Launch Unsuccessful, Autonomous F-16s The Air Force has begun ground testing a future uncrewed jet design in a milestone tow>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC