Boeing To Provide Airport And Airspace Modeling Services In Turkey | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.24.25

AirborneNextGen-
11.18.25

Airborne-Unlimited-11.19.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sun, Jun 26, 2016

Boeing To Provide Airport And Airspace Modeling Services In Turkey

Jeppesen TAAM Solution To Assist In Development Of Istanbul New Airport Airspace Design

Boeing has announced a new Technical Assistance Agreement with iGA Havalimani Isletmesi A.S. (IGA), the developer and operator of Istanbul New Airport.

Through the agreement, Boeing subsidiary Jeppesen will provide its Total Airport and Airspace Modeler (TAAM) solution to assist IGA and DHMI, Turkey’s General Directorate of State Airports Authority. This group will support the development of Istanbul New Airport airspace design, the airport operation optimization program and an operational readiness plan.

“We look forward to working with IGA and DHMI to find the most effective operational concepts for the Istanbul area, as part of the overall investment in the infrastructure of Turkish aerospace,” said Aysem Sargin, managing director of Boeing Turkey. “Using our TAAM tool, we will be able to show the impacts of all operational concepts and assist the Istanbul New Airport team to make the most informed decisions possible for the new airport.”

The state of the art Jeppesen TAAM analysis tool will be used with the IGA and DHMI teams to conduct studies that would potentially maximize Istanbul New Airport runway operations and overall airspace capacity and efficiency. Maintaining safety and minimizing airspace conflict within the regional Istanbul Terminal Control Area is another key aspect of the project.

Several operational procedure alternatives will be simulated and analyzed by TAAM to assist the new airport’s airspace and runway optimization process. Both IGA and DHMI will be trained to use the TAAM solution, allowing active participation in the project, as well as the ability to conduct their own continuing analysis projects, following the successful delivery of Jeppesen’s analysis.

(Source: Boeing news release)

FMI: www.boeing.com

Advertisement

More News

Classic Aero-TV: Pure Aerial Precision - The Snowbirds at AirVenture 2016

From 2016 (YouTube Edition): The Canadian Forces Snowbirds Can Best Be Described As ‘Elegant’… EAA AirVenture 2016 was a great show and, in no small part, it was>[...]

NTSB Final Report: Costruzioni Aeronautiche Tecna P2012 Traveller

Airplane Lunged Forward When It Was Stuck From Behind By A Tug That Was Towing An Unoccupied Airliner Analysis: At the conclusion of the air taxi flight, the flight crew were taxii>[...]

ANN's Daily Aero-Linx (11.23.25)

Aero Linx: International Stinson Club So you want to buy a Stinson. Well the Stinson is a GREAT value aircraft. The goal of the International Stinson Club is to preserve informatio>[...]

ANN's Daily Aero-Term (11.23.25): Request Full Route Clearance

Request Full Route Clearance Used by pilots to request that the entire route of flight be read verbatim in an ATC clearance. Such request should be made to preclude receiving an AT>[...]

Aero-News: Quote of the Day (11.23.25)

"Today's battlefield is adapting rapidly. By teaching our soldiers to understand how drones work and are built, we are giving them the skills to think creatively and apply emerging>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC