Boeing Completes Flight Testing For Certification Of 787s With GE Engines | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Fri, Mar 09, 2012

Boeing Completes Flight Testing For Certification Of 787s With GE Engines

Completes All Flight Testing On Baseline Dreamliner

All flight tests expected to be required for type certification of the 787-8 Dreamliner with General Electric GEnx engines have been completed. This marks the end of all certification flight testing associated with the baseline model of the 787. Testing on engine and airframe improvements will continue as needed, as it does for all airplane programs.

Ground testing to complete certification requirements has also concluded.

"The last phase of testing focused on extended operations on board a production airplane," said Mike Sinnett, vice president and chief project engineer, 787 program. "The airplane performed beautifully during this testing, further demonstrating its reliability."

The final flight concluded late last month with the landing of the 35th 787 built. Flight testing is one of many elements reviewed by the U.S. Federal Aviation Administration before it certifies a new airplane type. Certification of the 787 Dreamliner with Rolls-Royce engines was completed in August 2011. Each new combination of airframe type and engine requires additional certification.

"I want to congratulate all of the men and women of Boeing and our partners who helped support our flight test program," Sinnett said. "They have completed the most robust, thorough flight test program in our history."

The Boeing 787 Dreamliner features a wide array of passenger amenities including larger windows, cleaner air, higher humidity and a lower cabin altitude.

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Linx (06.29.25)

Aero Linx: Transport Canada We are a federal institution, leading the Transport Canada portfolio and working with our partners. Transport Canada is responsible for transportation p>[...]

ANN's Daily Aero-Term (06.29.25): Gross Navigation Error (GNE)

Gross Navigation Error (GNE) A lateral deviation from a cleared track, normally in excess of 25 Nautical Miles (NM). More stringent standards (for example, 10NM in some parts of th>[...]

Classic Aero-TV: Anticipating Futurespace - Blue Origin Visits Airventure 2017

From AirVenture 2017 (YouTube Edition): Flight-Proven Booster On Display At AirVenture… EAA AirVenture Oshkosh is known primarily as a celebration of experimental and amateu>[...]

NTSB Final Report: Cirrus SR22

Aircraft Parachute System (CAPS) Was Deployed About 293 Ft Above Ground Level, Which Was Too Low To Allow For Full Deployment Of The Parachute System Analysis: The day before the a>[...]

Airborne Affordable Flyers 06.26.25: PA18 Upgrades, ‘Delta Force’, Rhinebeck

Also: 48th Annual Air Race Classic, Hot Air Balloon Fire, FAA v Banning 100LL, Complete Remote Pilot The news Piper PA-18 Super Cub owners have been waiting for has finally arrived>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC