FAA Issues Emergency AD For Some Pratt & Whitney Canada Engines | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.09.25

Airborne-Unlimited-12.10.25

Airborne-AffordableFlyers-12.11.25

AirborneUnlimited-12.12.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Fri, Sep 16, 2011

FAA Issues Emergency AD For Some Pratt & Whitney Canada Engines

Issues Found With Certain First Stage Reduction Sun Gears

The FAA has sent a notice of an emergency AD (2011-20-51) to owners and operators of Pratt & Whitney Canada PT6A-15AG, -27, -28, -34, -34AG, -34B, and -36 series turboprop engines.

The move was prompted by failures of certain first stage reduction sun gears, manufactured by Timken Alcor Aerospace Technologies, Inc. These gears are manufactured under a part manufacturer approval (PMA) as replacement parts for installation in propeller reduction gearbox assemblies of Pratt & Whitney Canada PT6A-15AG, -27, -28, -34, -34AG, -34B, and -36 series turboprop engines. About 80 of these sun gears are suspect for having a manufacturing anomaly. About half of the suspect sun gears have already been taken out of service. This condition, if not corrected, could result in failure of the shaft portion of the sun gear, which will result in an engine in-flight shut down, possible uncontained engine failure, aircraft damage, and serious injuries.

The AD was issued after the FAA evaluated of all the relevant information, and determined the unsafe condition described previously is likely to exist or develop in other products of the same type design. The FAA has found that the risk to the flying public justifies issuing this AD on an emergency basis.

The AD requires the removal of affected PMA replacement Timken Alcor Aerospace Technologies, Inc. first stage reduction sun gear and the interacting planet gears, from the propeller reduction gearbox assembly, within 15 operating hours or 15 days after receipt of this AD, whichever occurs first.

FMI: http://rgl.faa.gov/Regulatory_and_Guidance_Library/rgAD.nsf/0/994D43AAE16A4BF68625790C005F46A7?OpenDocument

Advertisement

More News

ANN's Daily Aero-Term (12.13.25): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (12.13.25)

“We have performed extensive ground testing by comparing warm up times, full power tethered pulls, and overall temperatures in 100 degree environments against other aircraft >[...]

NTSB Final Report: Gippsland GA-8

While Taxiing To Parking The Right Landing Gear Leg Collapsed, Resulting In Substantial Damage Analysis: The pilot made a normal approach with full flaps and landed on the runway. >[...]

Classic Aero-TV: Historically Unique -- Marlin Horst's Exquisite Fairchild 71

From 2014 (YouTube Edition): Exotic Rebuild Reveals Aerial Work Of Art During EAA AirVenture 2014, ANN's Michael Maya Charles took the time to get a history lesson about a great ai>[...]

Airborne 12.12.25: Global 8000, Korea Pilot Honors, AV-30 Update

Also: Project Talon, McFarlane Acquisition, Sky-Tec Service, JPL Earth Helo Tests Bombardier has earned a round of applause from the business aviation community, celebrating the fo>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC