This Time, For Sure, Probably | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Tue, Jul 01, 2003

This Time, For Sure, Probably

7E7 "Dreamliner" Will Likely Get Built: Condit

It's not the way to predict things, by saying that after a row of false starts, Boeing's ready to actually start work on a new airplane; but that's the message Boeing's chair, Phil Condit, gave reporters in London last week.

He said that, "By the law of averages, we must be at the right place," after the start-stop programs that included the 747X, the Sonic Cruiser, and the 747-800. Add to those notable flops the stillborn 767-400ER and a couple other 747 ideas, and anyone would conclude that, this time, Boeing's marketing mavens would have it right; except that they have had it wrong, so consistently, lately.

That's not to say that Airbus has been hitting nothing but home runs, either: the A3XX (A380) is a very risky program, particularly so as it was launched before the terrorist attacks; and the A400M military heavy-lifter program is not much more than a joke, except to the governments that got a piece of the "action," and will have to pay so dearly for their "jobs programs."

Overcapacity in the big-airliner industry will be a factor for a long time; and that systemic problem will not go away until the flying public stops minding being hassled at every turn, and until some failed airlines are permitted by their sponsor-governments to actually fold up.

 Condit, in making the remarks, certainly knows that, by the time the new "Dreamliner" gets into the air, a lot of that overcapacity, at least in older airframes, will be back at the recyclers. If the 7E7 delivers, as predicted, 20% or more efficiency, its viability, by 2008, should be a no-brainer.

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Linx (06.29.25)

Aero Linx: Transport Canada We are a federal institution, leading the Transport Canada portfolio and working with our partners. Transport Canada is responsible for transportation p>[...]

ANN's Daily Aero-Term (06.29.25): Gross Navigation Error (GNE)

Gross Navigation Error (GNE) A lateral deviation from a cleared track, normally in excess of 25 Nautical Miles (NM). More stringent standards (for example, 10NM in some parts of th>[...]

Classic Aero-TV: Anticipating Futurespace - Blue Origin Visits Airventure 2017

From AirVenture 2017 (YouTube Edition): Flight-Proven Booster On Display At AirVenture… EAA AirVenture Oshkosh is known primarily as a celebration of experimental and amateu>[...]

NTSB Final Report: Cirrus SR22

Aircraft Parachute System (CAPS) Was Deployed About 293 Ft Above Ground Level, Which Was Too Low To Allow For Full Deployment Of The Parachute System Analysis: The day before the a>[...]

Airborne Affordable Flyers 06.26.25: PA18 Upgrades, ‘Delta Force’, Rhinebeck

Also: 48th Annual Air Race Classic, Hot Air Balloon Fire, FAA v Banning 100LL, Complete Remote Pilot The news Piper PA-18 Super Cub owners have been waiting for has finally arrived>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC