AD: DG Flugzeugbau GmbH Gliders | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Tue, Apr 24, 2018

AD: DG Flugzeugbau GmbH Gliders

AD NUMBER: 2018-07-22

PRODUCT: DG Flugzeugbau GmbH Model DG-500MB gliders that are equipped with a Solo 2625 02 engine modified with a fuel injection system following the instructions of Solo Kleinmotoren GmbH Technische Mitteilung Nr. 4600-3 and identified as Solo 2625 02i.

ACTION: Final Rule.

SUMMARY: This AD results from mandatory continuing airworthiness information (MCAI) originated by an aviation authority of another country to identify and correct an unsafe condition on an aviation product.

The MCAI describes the unsafe condition as the potential of an in-flight shut-down and engine fire due to failure of the connecting stud for the two fuel injector mounts of the engine redundancy system on gliders equipped with a Solo 2625 02i engine.

The FAA is issuing this AD to add a model to the applicability and require actions to address the unsafe condition on these products.

DATES: This AD is effective May 25, 2018.

COST: The FAA estimates that this AD will affect 6 products of U.S. registry. The agency further estimates that it would take about 1 work-hour per product to comply with the basic requirements of this AD.

The average labor rate is $85 per work-hour. Required parts would cost about $67 per product. Based on these figures, the estimated cost of this AD on U.S. operators to be $912, or $152 per product.

FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (05.16.24): Instrument Runway

Instrument Runway A runway equipped with electronic and visual navigation aids for which a precision or nonprecision approach procedure having straight-in landing minimums has been>[...]

ANN's Daily Aero-Linx (05.16.24)

Aero Linx: Alaska Airmen's Association The Alaska Airmen's Association includes over 2,000 members—we are one of the largest General Aviation communities in the country. We s>[...]

Airborne 05.15.24: Ghost Sq MidAir, B-2 Junked, Dream Chaser Readies

Also: Flt School Security, G600 Steep-Approach, Honduran Aid, PW545D Cert Two aircraft performing at the Fort Lauderdale Air Show clipped wings during a routine last Sunday, spooki>[...]

Airborne 05.10.24: Icon Auction, Drunk MedEvac Pilot, Bell ALFA

Also: SkyReach Parts Support, Piper Service Ctr, Airliner Near-Miss, Airshow London The Judge overseeing Icon's convoluted Chapter 11 process has approved $9 million in Chapter 11 >[...]

Airborne Affordable Flyers 05.16.24: PRA Runway, Wag-Aero Sold, Young Eagles

Also: Paramotor Champ's, Electric Ultralight, ICON BK Update, Burt Rutan at Oshkosh! The Popular Rotorcraft Association is reaching out for help in rebuilding their private runway >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC