Aurora Flight Sciences To Supply Composite Structures For Relentless | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Mon, Jul 21, 2014

Aurora Flight Sciences To Supply Composite Structures For Relentless

Fairings For Main Engine Cowling Section To Be Built In WV

Aurora Flight Sciences announced from the Farnborough Air Show that they have been selected by Bell Helicopter to manufacture composite airframe structures as part of the Bell 525 Relentless helicopter program.

The composite fairings of the Bell 525's main engine cowling section will be manufactured and assembled at Aurora's Bridgeport, West Virginia facility. Aurora will work directly with the Bell Helicopter team to meet challenging schedule and production rate requirements.

"Aurora is pleased to be a part of the Bell Helicopter 525 Relentless team," said Mark Cherry, Aurora's President and Chief Operating Officer. "Aurora's production capabilities and expertise in composite manufacturing were key discriminators in Bell Helicopter's decision to choose Aurora for this exciting program."

Headquartered in Manassas, VA, Aurora Flight Sciences designs and manufactures large composite structures for defense and commercial aerospace applications. The company operates production plants in Bridgeport, WV and Columbus, MS and a Research and Development Center in Cambridge, MA.

(Image provided by Aurora Flight Sciences)

FMI: www.aurora.aero

Advertisement

More News

ANN's Daily Aero-Term (05.05.25): Circle To Runway (Runway Number)

Circle To Runway (Runway Number) Used by ATC to inform the pilot that he/she must circle to land because the runway in use is other than the runway aligned with the instrument appr>[...]

ANN's Daily Aero-Linx (05.05.25)

Aero Linx: National Aviation Safety Foundation (NASF) The National Aviation Safety Foundation is a support group whose objective is to enhance aviation safety through educational p>[...]

NTSB Prelim: De Havilland DHC-1

At Altitude Of About 250-300 Ft Agl, The Airplane Experienced A Total Loss Of Engine Power On November 6, 2024, at 1600 central standard time, a De Havilland DHC-1, N420TD, was inv>[...]

Classic Aero-TV: The Boeing Dreamliner -- Historic First Flight Coverage

From 2009 (YouTube Edition): Three Hour Flight Was 'Flawless' -- At Least, Until Mother Nature Intervened For anyone who loves the aviation business, this was a VERY good day. Afte>[...]

Airborne-NextGen 05.06.25: AF Uncrewed Fighters, Drones v Planes, Joby Crew Test

Also: AMA Names Tyler Dobbs, More Falcon 9 Ops, Firefly Launch Unsuccessful, Autonomous F-16s The Air Force has begun ground testing a future uncrewed jet design in a milestone tow>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC