Boeing Completes First Shuttle Main Engine | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sun, Aug 08, 2004

Boeing Completes First Shuttle Main Engine

Engine is the first to be fully assembled at Kennedy Space Center

Rocketdyne Propulsion and Power, a business unit of The Boeing Company, recently completed the build-up and avionics testing of engine 2058, the first Space Shuttle Main Engine (SSME) fully assembled at Kennedy Space Center. This week, in the SSME Processing Facility, technicians hoisted the more than 7,500-pound engine from its vertical work stand into a horizontal position in preparation for shipment to NASA’s Stennis Space Center in Mississippi to undergo a hot fire acceptance test.

Historically, SSMEs were built and assembled at Rocketdyne facilities in Canoga Park, Calif., with post-flight inspections performed at KSC.  Both functions were consolidated in February 2002. Engine 2058 is the first of five engines to be fully assembled on site, to reach the desired number of 15 SSMEs ready for launch at any given time in the Space Shuttle Program.

“Our team is certainly proud of the fact that this engine, the first to be fully assembled at KSC, will be part of our near-term Shuttle fleet and a major player in support of NASA’s Return to Flight efforts in 2005,” noted Mike Cosgrove, Rocketdyne flow manager. “It’s a major achievement for us and we’re pleased to continue to deliver a quality product to the customer.” 

Processing and assembly work began in February. The engine reached its first major milestone in April when the powerhead unit, a main component of the engine, was mated to the Main Combustion Chamber. The engine is scheduled for shipping later this month and will return to KSC following acceptance testing. Engine 2058 is currently slated for orbiter Atlantis on the STS-115 mission, currently set for no earlier than September 2005.
 
"The transfer of SSME assembly operations to KSC has enabled the reduction of infrastructure at Rocketdyne's Canoga Park facility, and enhancement of engine processing capability at KSC,” said Gene Goldman, SSME project manager at NASA’s Marshall Space Flight Center in Huntsville, Ala. “The transfer provides a workload-leveling capability for the KSC engine workforce and consolidation of operations at Canoga Park. This arrangement has provided a 'win-win' for both locations.”

Each Space Shuttle employs three reusable main engines. Each is 14 feet long, with a  7.5-foot-diameter nozzle, generating almost 400,000 pounds of thrust. The Rocketdyne Propulsion and Power division of The Boeing Company manufactures the engines for NASA.

FMI: www.boeing.com/space/rdyne/flash.html

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC