First Airbus A380 Nose Section Delivered | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.28.25

Airborne-NextGen-04.29.25

AirborneUnlimited-04.30.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Tue, Dec 02, 2003

First Airbus A380 Nose Section Delivered

A REALLY BIG Bird Comes Together

The nose section of the first A380 has been completed at Airbus’ Méaulte plant and delivered to Airbus Saint-Nazaire.

A ceremony in Méaulte, France, was attended by French Minister of Equipment, Transport, Housing, Tourism and the Sea, Gilles de Robien, and by many personalities from the region, Airbus representatives and all the Airbus Méaulte personnel.

Production of an Airbus aircraft nose section requires the use of leading technologies to machine and assemble of complex parts. Airbus has developed an assembly concept using spatial positioning assisted by laser-beam measuring which allows the parts to be worked on in a variety of positions.

The frames of the cockpit windshield panes are made by high-speed machining with "spatial volumetric milling" while the upper part of the cockpit – whose shape is highly complex - is assembled by automatic riveting on a 5-axis machine.

Méaulte produces nose sections for the entire family of Airbus aircraft. The size and weight of the A380 nose section is particularly impressive. It comprises two sections weighing 1390 kg (length: 3.4 m; width: 5.4 m; height: 5.4 m) and 1800 kg (length: 4.2 m; width: 6.6 m; height: 6.7 m) respectively.

The A380 nose section is being transported to Saint Nazaire, France by Beluga from the Beauvais Tillé airport. Plans are to use the new Haute Picardie aero-industrial platform of Méaulte from 2007.

FMI: www.airbus.com

Advertisement

More News

Lockheed Hands Over Completed Artemis II Spacecraft

NASA Takes in Orion, Begins Launch Processing for a Crewed Mission Aerospace giant Lockheed Martin recently turned in its share of the Artemis II venture, delivering its Orion spac>[...]

NTSB Final Report: Pulsar Super Pulsar

During The Forced Landing, The Airplane Landed Short Of The Runway And Left Of The Runway Centerline Analysis: The pilot reported that, during the initial climb, the engine lost pa>[...]

Classic Aero-TV: Van Horn Rotor Blades -- Tail Rotor Replacements For Bell's 206

From 2010 (YouTube Edition): Company Pioneers Alternatives For Bell 206 TR Blades The approved part replacement business can be a tough one... especially when you're competing with>[...]

ANN's Daily Aero-Term (05.02.25): Obstacle

Obstacle An existing object, object of natural growth, or terrain at a fixed geographical location or which may be expected at a fixed location within a prescribed area with refere>[...]

Aero-News: Quote of the Day (05.02.25)

“NATA’s 3,700 member companies operate at nearly 4,500 airports in thousands of communities across the nation, providing air transportation services, driving economic g>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC