Fully Outfitted Gulfstream G600 Test Aircraft Completes First Flight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Thu, Aug 31, 2017

Fully Outfitted Gulfstream G600 Test Aircraft Completes First Flight

Becomes The Fifth G600 Aircraft To Fly In Less Than Nine Months

The final aircraft in the Gulfstream G600 flight-test program has flown for the first time. Outfitted with a complete interior, the aircraft serves as a cabin testbed to ensure a superior customer experience. The aircraft is the fifth to join the G600 flight-test program since it began on Dec. 17, 2016.

The G600 took off from Savannah/Hilton Head International Airport at 3:07 p.m. During the 2- hour and 55-minute flight, the aircraft reached an elevation of 51,000 feet/15,545 meters and a speed of Mach 0.85. The aircraft landed back in Savannah at 6:02 p.m. local time.

“The goal of including a production aircraft in our flight-test program is to ensure we deliver the most functional, comfortable and reliable cabin environment for our customers,” said Mark Burns, president, Gulfstream. “Our extensive testing will validate design and performance, so we can provide a cabin that exceeds expectations.”

Gulfstream will conduct repeated operations of all cabin systems to evaluate comfort, layout, noise, ergonomics, functionality, passenger interaction and appliance reliability.

To date, the G600 program’s five test aircraft have accumulated more than 180 flights and 790 flight hours.

“We now have 10 aircraft flying in our concurrent Gulfstream G500 and G600 flight-test programs,” Burns said. “That’s a remarkable achievement for business aviation and a first for the company. It reflects the priority we place on adhering to a long-term strategy, investing in research and development, leveraging our ground-based labs and ensuring consistent and steady progress in aircraft development.”

Gulfstream anticipates receiving FAA type certification for the all-new G600 in 2018. Customer deliveries are scheduled for later that year.

(Image provided with Gulfstream news release)

FMI: www.gulfstream.com

Advertisement

More News

NTSB Final Report: Douglas A-4K

Pilot Applied Full Aft Stick And Nose-Up Trim, But The Airplane Remained On The Runway Analysis: The pilot reported that a preflight inspection and flight control checks revealed n>[...]

ANN FAQ: Q&A 101

A Few Questions AND Answers To Help You Get MORE Out of ANN! 1) I forgot my password. How do I find it? 1) Easy... click here and give us your e-mail address--we'll send it to you >[...]

Classic Aero-TV: PBY Catalina--From Wartime to Double Sunrise to the Long Sunset

From 2022 (YouTube Edition): Before They’re All Gone... Humankind has been messing about in airplanes for almost 120-years. In that time, thousands of aircraft representing i>[...]

ANN's Daily Aero-Term (07.01.25): Advanced Air Mobility (AAM)

Advanced Air Mobility (AAM) A transportation system that transports people and property by air between two points in the NAS using aircraft with advanced technologies, including el>[...]

ANN's Daily Aero-Linx (07.01.25)

Aero Linx: MQ-1B Predator The MQ-1B Predator is an armed, multi-mission, medium-altitude, long-endurance remotely piloted aircraft that is employed primarily as an intelligence-col>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC