Orbital ATK Awarded Contract by ULA For Large Composite Structures | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Sun, Dec 27, 2015

Orbital ATK Awarded Contract by ULA For Large Composite Structures

Composite Hardware To Be Used Aboard Atlas V, Delta IV Rocket Launches Through Approximately 2021

Orbital ATK has been awarded a contract from United Launch Alliance (ULA) for large-size composite structures to be used for the Atlas V and Delta IV vehicles in support of the current United States Air Force Evolved Expendable Launch Vehicles (EELV) programs. During the contract scope, Orbital ATK will produce large composite structures for ULA, with deliveries commencing in 2016 and continuing into early 2019. Hardware from the new order will support both Atlas V and Delta IV launches through approximately 2021.

"Our long-standing involvement on both the Atlas V and Delta IV launch vehicles is a strong demonstration of our workforce’s engineering and manufacturing abilities," said Steve Earl, Vice President and General Manager of Orbital ATK’s Aerospace Structures Division. "Our support of ULA EELV missions is a critical element of our aerospace structures business, and we are proud to provide support for these marquee launch vehicle programs.”
 
The order consists of a variety of composite structures 13 to 18 feet in diameter with lengths up to 63 feet, including fairings, payload adapters and diaphragms, interstages, nose cones and structures providing main engine thermal/aerodynamic protection. All of the structures will be fabricated in Orbital ATK’s Large Structures Center of Excellence (COE) in Iuka, Mississippi, employing advanced fiber placement and hand lay-up processes, automated machining and ultrasonic inspection techniques.

(Source: Orbital ATK news release)

FMI: www.orbitalatk.com

Advertisement

More News

ANN's Daily Aero-Term (06.30.25): Ground Stop (GS)

Ground Stop (GS) The GS is a process that requires aircraft that meet a specific criteria to remain on the ground. The criteria may be airport specific, airspace specific, or equip>[...]

ANN's Daily Aero-Linx (06.30.25)

Aero Linx: Australian Transport Safety Bureau (ATSB) The Australian Transport Safety Bureau (ATSB) improves safety and public confidence in aviation, marine and rail transport thro>[...]

Aero-News: Quote of the Day (06.30.25)

“The Palo Alto stopover confirmed—yet again—that flight schools and aero-clubs are no longer just curious about electric training; they are ready to buy. In just >[...]

NTSB Final Report: ICON A5

Pilot’s Failure To Maintain Clearance From The Water While Flying At A Low Altitude Analysis: The flight of two airplanes was in cruise flight on a north heading about 50 ft >[...]

Airborne Affordable Flyers 06.26.25: PA18 Upgrades, ‘Delta Force’, Rhinebeck

Also: 48th Annual Air Race Classic, Hot Air Balloon Fire, FAA v Banning 100LL, Complete Remote Pilot The news Piper PA-18 Super Cub owners have been waiting for has finally arrived>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC