Shuttle Pad Makes Way For Ares 1-X Flight Tests | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Sat, Jun 06, 2009

Shuttle Pad Makes Way For Ares 1-X Flight Tests

First Launch Scheduled for August

By Wes Oleszewski

On Wednesday June, 3rd another in a string of modifications to launch pad 39B at the Kennedy Space Center took place. In preparation for the upcoming Ares I-X launch, scheduled to take place in late August, a Space Shuttle service component  was removed from the pad's Fixed Service Structure. 

The Gaseous Oxygen Vent Hood or GOX Hood was removed from the service tower by means of a crane. Although a critical Shuttle component GOX hood, which allows venting of the External Tank's liquid oxygen while at the same time preventing ice build-up, the hood will not be used in Ares I-X operations.

Once removed from the service structure, the GOX Hood and its swing arm were placed on trailers. The components will be trucked to a nearby storage area and kept as spares until the end of the Space Shuttle program. What will become of the components after the shuttle has been retired, has not been decided.

These modifications are a part of preparing Pad 39B for the Ares I series of launch vehicles. Future  modifications will include the removal of the Crew Access Arm and White Room. Plans eventually call for demolition of the pad's Rotating Service Structure and Fixed Service structure in order to return to the "Clean Pad" configuration that was used in the Apollo era. Noteworthy is the fact that the Fixed Service Structure itself is actually made up of the top dozen levels of an original Apollo Launch Umbilical Tower.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Linx (06.29.25)

Aero Linx: Transport Canada We are a federal institution, leading the Transport Canada portfolio and working with our partners. Transport Canada is responsible for transportation p>[...]

ANN's Daily Aero-Term (06.29.25): Gross Navigation Error (GNE)

Gross Navigation Error (GNE) A lateral deviation from a cleared track, normally in excess of 25 Nautical Miles (NM). More stringent standards (for example, 10NM in some parts of th>[...]

Classic Aero-TV: Anticipating Futurespace - Blue Origin Visits Airventure 2017

From AirVenture 2017 (YouTube Edition): Flight-Proven Booster On Display At AirVenture… EAA AirVenture Oshkosh is known primarily as a celebration of experimental and amateu>[...]

NTSB Final Report: Cirrus SR22

Aircraft Parachute System (CAPS) Was Deployed About 293 Ft Above Ground Level, Which Was Too Low To Allow For Full Deployment Of The Parachute System Analysis: The day before the a>[...]

Airborne Affordable Flyers 06.26.25: PA18 Upgrades, ‘Delta Force’, Rhinebeck

Also: 48th Annual Air Race Classic, Hot Air Balloon Fire, FAA v Banning 100LL, Complete Remote Pilot The news Piper PA-18 Super Cub owners have been waiting for has finally arrived>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC