It's A Successful First Flight For AH-64D Apache Block III Test Aircraft | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Tue, Dec 08, 2009

It's A Successful First Flight For AH-64D Apache Block III Test Aircraft

Increased Use Of Composites And New Engines In Block III Aircraft

The Boeing AH-64D Apache Block III program has completed the first flight of its structures test aircraft. The test, conducted Nov. 23 in Mesa, demonstrated flight characteristics and handling maneuvers. Tests to continue to expand the helicopter's flight envelope are expected to continue for the next several weeks.

Block III technologies being tested include the composite main rotor blade, composite horizontal stabilator, and -701D engines, which include an enhanced digital electronic control unit. The aircraft also features a split-torque face gear transmission that increases power throughput by more than 20 percent within the same physical operating space as the legacy transmission.

"This flight demonstration is another crucial step as the U.S. Army and Boeing work together to meet the objectives of the Apache Block III program," said Col. Shane Openshaw, Army Apache project manager. "The Apache Block III helicopter meets the Army's requirement to sustain the aircraft for its life cycle while providing superior capabilities to Army aviators, battlefield commanders and soldiers."

The program's avionics test aircraft, which made its first flight ahead of schedule in June 2008, completed the Army's Limited User Test according to schedule, in November, at the Yuma, AZ Proving Ground.

"Meeting calendar objectives while integrating new capabilities confirms the maturity of the multiple technologies conceived, designed and developed by Boeing and our key partners for the Apache Block III helicopter," said Al Winn, Boeing Apache Programs vice president. "Our success highlights the value of cooperative development."

The Army and Boeing continue to work toward an anticipated Department of Defense acquisition process Milestone C decision in April 2010.

FMI: www.boeing.com

Advertisement

More News

Aero-News: Quote of the Day (11.20.25)

“This recognition was evident during the TBMOPA Annual Convention, where owners and operators clearly expressed their satisfaction with our focus on customer service, and enc>[...]

ANN's Daily Aero-Term (11.20.25): Overhead Maneuver

Overhead Maneuver A series of predetermined maneuvers prescribed for aircraft (often in formation) for entry into the visual flight rules (VFR) traffic pattern and to proceed to a >[...]

ANN's Daily Aero-Linx (11.20.25)

Aero Linx: Glenn H. Curtiss Museum The Glenn H. Curtiss Museum, bearing the name of Hammondsport’s favorite son, is located on State Route 54, one half mile south of the vill>[...]

NTSB Prelim: Just Highlander

The Flight Instructor Noticed Some Engine Roughness And Diverted Toward Westwinds Airport On November 2, 2025, about 1630 mountain standard time, an experimental amateur-built Just>[...]

Classic Aero-TV: Just Like The 'Real' Thing – Redbird/Disney’s ‘Dusty’ FlightSim

From 2014 (YouTube Edition) -- Disclaimer: No Matter What He Tells You, Tom Is Not A Certified Firefighting Pilot While at EAA AirVenture 2014, ANN News Editor, Tom Patton checked >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC