NASA Awards $48 Million Contract To ATK Launch Systems | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Mon, Jan 08, 2007

NASA Awards $48 Million Contract To ATK Launch Systems

UT-Based Company Will Continue Development Of Ares I First Stage

Aero-News learned Monday NASA has authorized a $48 million contract for ATK Launch Systems of Brigham City, Utah, to continue design and development of the first stage for the Ares I crew launch vehicle.

The first stage will consist of a single reusable solid rocket booster and motor similar to those used on the space shuttle, but with a fifth motor segment added. The upper stage will consist of a J-2X liquid hydrogen, liquid oxygen engine and the associated propellant tanks and fuel distribution systems.

Ares I will transport the Orion crew exploration vehicle and its crew of up to six astronauts, or other small cargo payloads, to low-Earth orbit.

This Ares I first stage contract action will increase a first stage task under an existing shuttle contract by $48 million for a total work effort valued at $111 million. These activities are a preparatory effort leading up to the Ares I first stage prime contract, which will be awarded in the February 2007 timeframe.

NASA states the contract action maintains the design, development, test and evaluation schedule; expedites the procurement of new nozzle metal hardware and production tooling for propellant casting and nozzle fabrication; maintains the necessary design and engineering analysis; and continues participation in pilot parachute development tests.

The action also provides support for an initial test flight in the spring of 2009 known as Ares I-1 and provides support for Ares I-1 in preparation for Preliminary Design Review. The test flight will use a simulated fifth segment on the first stage and a simulated upper stage.

FMI: www.nasa.gov/ares, www.atk.com/CorporateOverview/corpover_thiokol.asp

Advertisement

More News

NTSB Final Report: Douglas A-4K

Pilot Applied Full Aft Stick And Nose-Up Trim, But The Airplane Remained On The Runway Analysis: The pilot reported that a preflight inspection and flight control checks revealed n>[...]

ANN FAQ: Q&A 101

A Few Questions AND Answers To Help You Get MORE Out of ANN! 1) I forgot my password. How do I find it? 1) Easy... click here and give us your e-mail address--we'll send it to you >[...]

Classic Aero-TV: PBY Catalina--From Wartime to Double Sunrise to the Long Sunset

From 2022 (YouTube Edition): Before They’re All Gone... Humankind has been messing about in airplanes for almost 120-years. In that time, thousands of aircraft representing i>[...]

ANN's Daily Aero-Term (07.01.25): Advanced Air Mobility (AAM)

Advanced Air Mobility (AAM) A transportation system that transports people and property by air between two points in the NAS using aircraft with advanced technologies, including el>[...]

ANN's Daily Aero-Linx (07.01.25)

Aero Linx: MQ-1B Predator The MQ-1B Predator is an armed, multi-mission, medium-altitude, long-endurance remotely piloted aircraft that is employed primarily as an intelligence-col>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC