Payload Integrations Completed For Next Ariane 5 Flight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Mon, Jul 02, 2012

Payload Integrations Completed For Next Ariane 5 Flight

Launch Scheduled For July 5th

The EchoStar XVII telecommunications platform has joined its MSG-3 co-passenger on Arianespace’s third Ariane 5 for launch in 2012, marking a key preparation milestone for this July 5 heavy-lift mission from the Spaceport in French Guiana. Encapsulated in its payload fairing, EchoStar XVII was lowered into place yesterday over the MSG-3 meteorological satellite – which was installed atop Ariane 5’s cryogenic core stage earlier in the week. The latest integration activity was performed inside the Spaceport’s launch vehicle Final Assembly Building.

With this new milestone, the Ariane 5’s dual payload “stack” has now been completed, clearing the way for final steps that will include functional tests, launch rehearsal and launch vehicle arming – followed by a readiness review and rollout to the Spaceport’s launch zone for an evening liftoff on July 5. Ariane 5 is to deliver a payload lift performance of more than 21,000 pounds. during the upcoming mission, which includes a combined total of over 16,500 lbs. for the EchoStar XVII and MSG-3 spacecraft, plus the launch vehicle’s dual-passenger dispenser system and satellite integration hardware.
 
EchoStar XVII – which is based on Space Systems/Loral’s powerful 1300 series satellite platform – will be operated by Hughes Network Systems, and it is to deliver broadband services to consumers, businesses and government customers across North America. Weighing approximately 13,448 lbs. at liftoff, the spacecraft employs a multi-spot beam, bent-pipe Ka-band architecture that provides significant additional capacity for Hughes.

MSG-3 was produced by an industry consortium led by Thales Alenia Space, for operation by EUMETSAT (the European Organisation for the Exploitation of Meteorological Satellites).  It has a liftoff mass of approximately 2,000 kg., and will operate in geostationary orbit after its deployment by Ariane 5 – providing highly detailed imagery of Europe, the North Atlantic and Africa for use by meteorologists and national weather forecasters.

(Image provided by Arianespace)

FMI: www.arianespace.com

Advertisement

More News

NTSB Final Report: Douglas A-4K

Pilot Applied Full Aft Stick And Nose-Up Trim, But The Airplane Remained On The Runway Analysis: The pilot reported that a preflight inspection and flight control checks revealed n>[...]

ANN FAQ: Q&A 101

A Few Questions AND Answers To Help You Get MORE Out of ANN! 1) I forgot my password. How do I find it? 1) Easy... click here and give us your e-mail address--we'll send it to you >[...]

Classic Aero-TV: PBY Catalina--From Wartime to Double Sunrise to the Long Sunset

From 2022 (YouTube Edition): Before They’re All Gone... Humankind has been messing about in airplanes for almost 120-years. In that time, thousands of aircraft representing i>[...]

ANN's Daily Aero-Term (07.01.25): Advanced Air Mobility (AAM)

Advanced Air Mobility (AAM) A transportation system that transports people and property by air between two points in the NAS using aircraft with advanced technologies, including el>[...]

ANN's Daily Aero-Linx (07.01.25)

Aero Linx: MQ-1B Predator The MQ-1B Predator is an armed, multi-mission, medium-altitude, long-endurance remotely piloted aircraft that is employed primarily as an intelligence-col>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC