Gulfstream G650 Logs Some Hours, Passes Initial Flight Tests | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.24.25

AirborneNextGen-
11.18.25

Airborne-Unlimited-11.19.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sat, Dec 05, 2009

Gulfstream G650 Logs Some Hours, Passes Initial Flight Tests

Gulfstream: 'Performs Flawlessly' During Nearly Two-Hour Flight

Gulfstream is providing new details about the G650's successful completion of its first series of flight tests. During a 1-hour and 45-minute flight, G650 project pilot Jake Howard and senior experimental test pilot Tom Horne, along with flight engineer Bill Osborne, tested the aircraft’s handling qualities, engine operability and flap operation.

Additionally, the crew evaluated the aircraft’s pitot-static systems, avionics, hydraulic systems, electrical power generation and distribution, flight controls, and cabin environmental and pressurization controls.

The evaluations were performed at intended airspeeds of up to 240 knots and desired altitudes of up to 9,500 feet. Throughout the flight, personnel from Gulfstream flight test, engineering and flight operations monitored key, real-time data using a new telemetry system configured to downlink more than 2,000 different parameters.

“The pilots’ reports indicate that the G650’s flying qualities were outstanding,” said Pres Henne, senior vice president, Programs, Engineering and Test, Gulfstream. “With its cutting-edge technology, the aircraft performed superbly, as we expected it would. We are very excited to continue our flight-test program and look forward to certification in 2011.”

The G650 flight-test and certification plan involves five aircraft and more than 1,800 hours of testing. Gulfstream is working toward concurrent certification from the Federal Aviation Administration and the European Aviation Safety Agency in 2011.

Gulfstream announced the G650 program on March 13, 2008. On Sept. 29, 2009, the aircraft rolled out under its own power in front of a crowd of more than 7,000 people. It completed its first flight on Nov. 25, 2009, and remains on schedule for entry-into-service in 2012. The G650 is powered by Rolls-Royce BR725 engines, is capable of traveling 7,000 nautical miles at 0.85 Mach and has a maximum operating speed of 0.925 Mach.

FMI: www.gulfstream.com

Advertisement

More News

Aero-News: Quote of the Day (11.27.25)

“Achieving PMA for the S-1200 Series magnetos is another step in expanding our commitment to providing the aviation community with the most trusted and durable ‘firewal>[...]

Airborne 11.26.25: Bonanza-Baron Fini, Archer v LA NIMBYs, Gogo Loses$$$

Also: Bell 505 on SAF, NYPA Gets Flak For BizAv 'Abuse', FAA Venezuela Caution, Horizon Update Textron Aviation has confirmed it will be ending production of the Beechcraft Bonanza>[...]

FAA Seeks Info For New Brand-New ATC Platform

State-Of-The-Art Common Automation Platform To Replace Legacy Systems The FAA has issued a Request for Information (RFI) regarding the initiative of the Trump Administration and U.>[...]

USAF Reaper Drone Crashes Off the South Korean Coast

Kunsan Air Base Reported the Accident During Routine Operations The US Air Force has confirmed that it lost an MQ-9 Reaper drone to the South Korean waters on November 24. The airc>[...]

Hartzell Engine Tech Magneto Gains FAA-PMA

PowerUp S-1200 Series Approved, Available for 4- And 6-Cylinder Engines Hartzell Engine Tech announced it received FAA Parts Manufacturer Approval for its PowerUp S-1200 Series air>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC