Runway Construction Nearly Complete At Kissimmee, FL Gateway Airport | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Wed, May 21, 2014

Runway Construction Nearly Complete At Kissimmee, FL Gateway Airport

Normal Operations Expected To Resume By June 6

The City of Kissimmee Gateway Airport announces that the construction on Runway 06/24 is coming to a close.  The construction is coming into its final phase, which will include cutting grooves into the new asphalt to improve braking action. While this work will take place during normal business hours during the week of May 29 thru June 1, there is a potential for noise and vibration to be encountered by those in close proximity to the airport.  The runway is expected to return to normal operations by Friday, June 6.

Runway 06/24 is only operated when strong winds blow out of the east or west, or when the main runway is closed for maintenance or aircraft emergencies, however these events can mean the runway is used continuously for several days at a time.
 
The $2.7 million dollar project, funded by the FAA, Florida Department of Transportation and Kissimmee Gateway Airport funds, was the first major resurfacing since the 1980’s, and the new LED airfield lights installed as part of the project will generate significant energy savings.

(Image provided by City of Kissimmee, FL)

FMI: www.kissimmeeairport.com

Advertisement

More News

Airborne 07.02.25: TikToker Arrested, Vietnam A/L Ground Hit, ATC Modernization

Also: Outlaw Prop 4 Mooney, Ready 4 Duty, Ukrainian F-16 Pilot Lost, Blue Origin Flt On his journey to become the first pilot to land solo on all seven continents, 19-year-old Etha>[...]

Airborne Affordable Flyers 07.03.25: Sonex HW, BlackShape Gabriel, PRA Fly-In 25

Also: DarkAero Update, Electric Aircraft Symposium, Updated Instructor Guide, OSH Homebuilts Celebrate The long-awaited Sonex High Wing prototype has flown... the Sonex gang tells >[...]

ANN's Daily Aero-Term (07.07.25): Discrete Code

Discrete Code As used in the Air Traffic Control Radar Beacon System (ATCRBS), any one of the 4096 selectable Mode 3/A aircraft transponder codes except those ending in zero zero; >[...]

Classic Aero-TV: DeltaHawk Aero Engine Defies Convention

From 2023 (YouTube Edition): Deviation from the Historical Mean Racine, Wisconsin-based DeltaHawk is a privately-held manufacturer of reciprocating engines for aircraft and hybrid >[...]

ANN's Daily Aero-Linx (07.07.25)

Aero Linx: Formation and Safety Team (F.A.S.T.), USA The Formation and Safety Team (FAST) is a worldwide, educational organization dedicated to teaching safe formation flying in Wa>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC