New GA Terminal Coming To Greenville-Spartanburg Airport | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Wed, Mar 11, 2009

New GA Terminal Coming To Greenville-Spartanburg Airport

Former Building Damaged In 2007 Storm

For the better part of two decades, the Greenville-Spartanburg International Airport in South Carolina has been fighting an uphill image battle. For years, it was known as the Greenville-Spartanburg Jetport.

Around 1990, a coordinated effort was made to get the locals to call it by its FAA identifier, GSP... thought to be a more sophisticated-sounding name. Locals responded by joking it would more accurately be called "the Greenville-Spartanburg Propeller Port."

A more recent blow to the airport's image was dealt by a 2007 rainstorm, which collapsed the roof of the general aviation terminal. In what probably should have become a Jeff Foxworthy joke, Stevens Aviation, the field's FBO, was forced to move out of the unsafe building into... a trailer.

Things are finally looking up. The Spartanburg Herald-Journal reports the Greenville-Spartanburg Airport Commission Monday awarded a contract valued at $1.25 million dollars to JonScot General Contractors of Greenville for construction of a new, 5,000 square-foot GA terminal. It will even have some thoroughly modern touches, using mostly recycled materials in construction, and incorporating rainwater collectors, day lighting and a solar water heating system.

GSP Spokeswoman Rosylin Weston observes, "For some of our customers, this is their first impression of the Upstate and we want to make it a good one."

In addition to providing the airport with a facelift, the construction jobs will be welcome. Construction is expected to start by April 1, and be completed by year's end.

FMI: www.gspairport.com

Advertisement

More News

Airborne 07.02.25: TikToker Arrested, Vietnam A/L Ground Hit, ATC Modernization

Also: Outlaw Prop 4 Mooney, Ready 4 Duty, Ukrainian F-16 Pilot Lost, Blue Origin Flt On his journey to become the first pilot to land solo on all seven continents, 19-year-old Etha>[...]

Airborne Affordable Flyers 07.03.25: Sonex HW, BlackShape Gabriel, PRA Fly-In 25

Also: DarkAero Update, Electric Aircraft Symposium, Updated Instructor Guide, OSH Homebuilts Celebrate The long-awaited Sonex High Wing prototype has flown... the Sonex gang tells >[...]

ANN's Daily Aero-Term (07.07.25): Discrete Code

Discrete Code As used in the Air Traffic Control Radar Beacon System (ATCRBS), any one of the 4096 selectable Mode 3/A aircraft transponder codes except those ending in zero zero; >[...]

Classic Aero-TV: DeltaHawk Aero Engine Defies Convention

From 2023 (YouTube Edition): Deviation from the Historical Mean Racine, Wisconsin-based DeltaHawk is a privately-held manufacturer of reciprocating engines for aircraft and hybrid >[...]

ANN's Daily Aero-Linx (07.07.25)

Aero Linx: Formation and Safety Team (F.A.S.T.), USA The Formation and Safety Team (FAST) is a worldwide, educational organization dedicated to teaching safe formation flying in Wa>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC