Busy Tuesday -- Spacesuit Fit Checks and Microsatellite Deployment | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.08.25

AirborneNextGen-
09.09.25

Airborne-Unlimited-09.10.25

Airborne-AffordableFlyers-09.11.25

AirborneUnlimited-09.12.25

Wed, Jun 24, 2020

Busy Tuesday -- Spacesuit Fit Checks and Microsatellite Deployment

The ISS May Be Cool... But It's NO Place For The Idle

The Expedition 63 crew has been reviewing tasks and trying on spacesuits ahead of two spacewalks set to begin Friday. Another microsatellite was deployed from the International Space Station, as well.

Two NASA astronauts spent all day Tuesday preparing for the first of two spacewalks that will start on Friday at 7:35 a.m. EDT. Commander Chris Cassidy and Flight Engineer Bob Behnken began the morning on a specialized computer going over the complex tasks they will use to upgrade station power systems. The second spacewalk is scheduled for July 1 at 7:20 a.m.

Space station managers will provide more details about the spacewalks during a live briefing on NASA TV starting Wednesday at 2 p.m. NASA TV will also begin its live coverage of Friday’s spacewalk at 6 a.m.

Flight Engineer Doug Hurley partnered with the spacewalkers in the morning and reviewed the Canadarm2 robotic arm procedures necessary to execute the maintenance spacewalks. Cosmonaut Ivan Vagner joined the trio in the afternoon helping Cassidy and Behnken in and out of their U.S. spacesuits to verify they fit.

The third Red-Eye microsatellite was staged outside Japan’s Kibo laboratory module ready for deployment. The station’s fine-tuned Canadian robotic hand, known as Dextre, grappled Red-Eye installed inside the Kaber Microsat Deployer from which it was ejected. It will test satellite communications, flight computers and thermal management technologies.

FMI: www.nasa.gov

Advertisement

More News

NTSB Prelim: Lancair NLA-275-FR-C

About 2132 And At 11,800 Ft MSL, The Airplane Began A Rapid Right Spiraling Descent On August 18, 2025, about 2133 central daylight time, a Lancair NLA-275-FR-C airplane, N345LA, w>[...]

ANN's Daily Aero-Linx (09.12.25)

Aero Linx: The Collings Foundation The Collings Foundation is a non-profit, Educational Foundation (501(c)3), founded in 1979. The purpose of the Foundation is to preserve and exhi>[...]

Aero-News: Quote of the Day (09.12.25)

"This first FAA certification enables us to address the pilot shortage crisis with modern training solutions. Flight schools need alternatives to aging fleets with 40-year-old desi>[...]

ANN's Daily Aero-Term (09.12.25): North Atlantic High Level Airspace (NAT HLA)

North Atlantic High Level Airspace (NAT HLA) That volume of airspace (as defined in ICAO Document 7030) between FL 285 and FL 420 within the Oceanic Control Areas of Bodo Oceanic, >[...]

Aero-News: Quote of the Day (09.13.25)

“HITRON embodies the Coast Guard’s spirit of innovation and adaptability. From its humble beginnings as a prototype program, it has evolved into a vital force in our co>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC