Gulfstream Names Brian Durrence Vice President Of Engineering | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Sat, Sep 26, 2015

Gulfstream Names Brian Durrence Vice President Of Engineering

Has Been With The Company Since 1990

Gulfstream has named Brian Durrence vice president of Engineering. He reports to Dan Nale, senior vice president, Programs, Engineering and Test, Gulfstream.

A 25-year Gulfstream veteran, Durrence started with the company as a structural engineer in 1990 and rose through the ranks to project engineer and project engineering manager before becoming chief engineer in 2010. Durrence has worked on a number of Gulfstream aircraft programs during his tenure, including the Gulfstream GIV-SP, GV, G450, G550, G650 and G650ER.

In his new role, Durrence is responsible for establishing the strategic vision of the Engineering organization, identifying and implementing best practices and ensuring the correct engineering skills are in place for designing, integrating, testing and certifying Gulfstream aircraft.

Durrence earned a Bachelor of Science degree in engineering from the Georgia Institute of Technology in Atlanta and a Master of Business Administration degree from Georgia Southern University in Statesboro.

(Image provided by Gulfstream)

FMI: www.gulfstream.com

Advertisement

More News

Aero-News: Quote of the Day (07.11.25)

“Honored to accept this mission. Time to take over space. Let’s launch.” Source: SecTrans Sean Duffy commenting after President Donald Trump appointed U.S. Secret>[...]

ANN's Daily Aero-Term (07.11.25): Permanent Echo

Permanent Echo Radar signals reflected from fixed objects on the earth's surface; e.g., buildings, towers, terrain. Permanent echoes are distinguished from “ground clutter&rd>[...]

ANN's Daily Aero-Linx (07.11.25)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

NTSB Final Report: Schweizer SGS 2-33A

Glider Encountered A Loss Of Lift And There Was Not Sufficient Altitude To Reach The Airport Analysis: The flight instructor reported that while turning final, the glider encounter>[...]

NTSB Prelim: Aeronca 7AC

Airplane Climbed To 100 Ft Above Ground Level, At Which Time The Airplane Experienced A Total Loss Of Engine Power On May 24, 2025, at 1300 eastern daylight time, an Aeronca 7AC, N>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC