Boeing Submits Proposal For Altair Lunar Lander | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Tue, Mar 03, 2009

Boeing Submits Proposal For Altair Lunar Lander

NASA Expected To Award Contracts In Spring

Boeing, through its Space Exploration division, submitted a proposal to NASA last week for Altair lunar lander design support. NASA is expected to award multiple contracts this spring.

The lunar lander, part of NASA's Constellation program, will launch aboard the Ares V heavy-lift rocket and provide astronauts with life support and a base for exploration missions. Altair will also return the crew to the Orion spacecraft that will transport the astronauts back to Earth.

The Altair Conceptual Design Contract calls for NASA-directed engineering tasks to support evaluation of conceptual designs, maturation of the vehicle design, and preparation of products for system-requirements and system-definition reviews.

"Boeing is uniquely positioned to provide great design support now, as well as to support Altair development, test and evaluation when the time comes," said Keith Reiley, lunar lander project manager for Boeing. "Our ability to transition a skilled space shuttle work force ensures we can distribute the necessary expertise where it is needed as NASA transitions from the shuttle program to Constellation. We plan to support NASA with a local core team, enterprisewide specialty engineering experts, and a range of suppliers, including small and innovative high-tech companies."

The Altair lunar lander is envisioned with two stages: The descent stage will house the majority of the fuel, power supplies, and breathing oxygen for the crew. The ascent stage will house the astronauts, life-support equipment, and fuel for the ascent stage motor and steering rockets.

The lander is intended to carry a crew of four and be able to stay on the moon for up to six months. Altair will be capable of landing with 15 to 17 metric tons of dedicated cargo. The first crewed flight is scheduled for 2020.

As ANN reported, NASA issued its request for proposal on January 28 and will manage the Altair Conceptual Design Contract out of Johnson Space Center in Houston.

FMI: www.boeing.com, http://procurement.jsc.nasa.gov/Altair

 


Advertisement

More News

ANN's Daily Aero-Linx (06.29.25)

Aero Linx: Transport Canada We are a federal institution, leading the Transport Canada portfolio and working with our partners. Transport Canada is responsible for transportation p>[...]

ANN's Daily Aero-Term (06.29.25): Gross Navigation Error (GNE)

Gross Navigation Error (GNE) A lateral deviation from a cleared track, normally in excess of 25 Nautical Miles (NM). More stringent standards (for example, 10NM in some parts of th>[...]

Classic Aero-TV: Anticipating Futurespace - Blue Origin Visits Airventure 2017

From AirVenture 2017 (YouTube Edition): Flight-Proven Booster On Display At AirVenture… EAA AirVenture Oshkosh is known primarily as a celebration of experimental and amateu>[...]

NTSB Final Report: Cirrus SR22

Aircraft Parachute System (CAPS) Was Deployed About 293 Ft Above Ground Level, Which Was Too Low To Allow For Full Deployment Of The Parachute System Analysis: The day before the a>[...]

Airborne Affordable Flyers 06.26.25: PA18 Upgrades, ‘Delta Force’, Rhinebeck

Also: 48th Annual Air Race Classic, Hot Air Balloon Fire, FAA v Banning 100LL, Complete Remote Pilot The news Piper PA-18 Super Cub owners have been waiting for has finally arrived>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC