NASA Creates Spacewalk Mishap Investigation Board | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Wed, Jul 24, 2013

NASA Creates Spacewalk Mishap Investigation Board

July 16 EVA Terminated Early Following Problems With Space Suit Life Support System

NASA has appointed a board to investigate the July 16 early termination of a spacewalk outside the International Space Station, develop a set of lessons learned from the incident and suggest ways to prevent a similar problem in the future.

The board will begin its work Friday, Aug. 2, in close coordination with a NASA engineering team already examining the spacesuit and life support equipment astronaut Luca Parmitano of the European Space Agency (ESA) used during the excursion. The engineering team is working to determine why water built up inside Parmitano's helmet.

Chris Hansen, International Space Station chief engineer at NASA's Johnson Space Center in Houston, will chair a five-member board.

The other four board members are:

  • Mike Foreman, NASA astronaut, Johnson Space Center, Houston
  • Richard Fullerton, International Space Station safety and mission assurance lead, Office of Safety and Mission Assurance, NASA Headquarters, Washington
  • Sudhakar Rajula, human factors specialist, Johnson Space Center, Houston
  • Joe Pellicciotti, chief engineer, NASA Engineering and Safety Center, Goddard Space Flight Center, Greenbelt Md.

The board will have access to experts and support personnel including an ESA liaison.

Members will gather relevant information, analyze facts, conduct any necessary tests, identify the cause or causes of the anomaly and any contributing factors, and make recommendations to the NASA administrator to prevent similar incidents from occurring during future spacewalks.

The board's investigation will run parallel with the engineering analysis already underway. The engineering team is focused on resolving equipment trouble in an effort to enable U.S. spacewalks to resume. The mishap investigation board will look more broadly at past operations and maintenance, quality assurance, aspects of flight control and other organizational factors. The board's responsibility is to make observations and recommendations that can be applied to improve the safety of all of NASA's human spaceflight activities.

Because of the helmet problem, flight director David Korth terminated the spacewalk after only 1 hour, 32 minutes. It was to have lasted 6 1/2 hours. Parmitano and fellow spacewalker Chris Cassidy of NASA safely returned inside the orbiting outpost.

FMI: www.nasa.gov/station
 

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC