Airport Rehab Contractors Wanted: Afghanistan | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Fri, Mar 25, 2005

Airport Rehab Contractors Wanted: Afghanistan

Apart From The Land Mines It's Just Like Anywhere Else With No Infrastructure

By ANN Senior Correspondent Kevin "Hognose" O'Brien

Can you rehab an airport that's in pretty bad shape? If so, the World Bank wants to hear from you. Especially if you're from a nation that's a member of the Asian Development Bank. The ADB has provided a loan to permit Afghanistan to start rehabilitating its regional airports, which have been devastated by 25 years of civil war and are in very poor shape to serve the booming Afghan economy.

The airports in question are facilities that are barely worthy of the name Airport. Once built by contractors from American and Russian aid programs during Afghanistan's neutral period, they've since been shelled, mortared, bombed, mined, burned, bulldozed, and looted of fixtures. So they're not looking for a simple job of putting up a localizer antenna or painting new stripes on the runway -- this is a big job.

The airports in the first phase are Bamian, Faizabad, and Maimanieh (see above). Bamian is in the mountainous Hazarajat west of Kabul, and is known as the former site of the giant Buddhas destroyed by the iconoclastic Taliban. Its runway is level, somewhat rutted gravel. Faizabad is in the northeast of the country, near Tajikstan. The present airstrip has a one-way runway with a significant slope to it. Maimanieh is in the northwestern quadrant of the country, where the nearest border is with Turkmenistan. The condition of the runway there is anybody's guess.

(The photographs are of an area of Kandahar IAP, taken by Hognose in 2002, but illustrate the general condition of Afghan aviation at that -- and this -- time).

Some parts of what the ADB needs done are pretty routine, although as you can see from the list it's more like "building" than "rebuilding:"

  • Survey
  • Security fencing
  • Detailed design of works
  • Drainage structures
  • Rehabilitation and widening of the existing runways
  • Pavement marking
  • Passenger terminal construction
  • Maintenance building construction
  • Fire station and control tower construction
  • Staff housing
  • Temperature controlled storage facility
  • Generator and electrical reticulation
  • Water reticulation and sewage

And some parts of the bid are a little bit out of the ordinary for the peaceable world:

  • Clearance of mines and unexploded ordinance

In addition, contractors should bear in mind that "rehabilitation of existing runways" may mean "doing a permanent repair instead of the hasty fix where a 2000 lb. bomb cratered the runway," or "replacing hasty runways of metal planking."

FMI: www.af.mil, www.devbusiness.org

Advertisement

More News

ANN's Daily Aero-Linx (05.06.25)

Aero Linx: International Federation of Airworthiness (IFA) We aim to be the most internationally respected independent authority on the subject of Airworthiness. IFA uniquely combi>[...]

ANN's Daily Aero-Term (05.06.25): Ultrahigh Frequency (UHF)

Ultrahigh Frequency (UHF) The frequency band between 300 and 3,000 MHz. The bank of radio frequencies used for military air/ground voice communications. In some instances this may >[...]

ANN FAQ: Q&A 101

A Few Questions AND Answers To Help You Get MORE Out of ANN! 1) I forgot my password. How do I find it? 1) Easy... click here and give us your e-mail address--we'll send it to you >[...]

Classic Aero-TV: Virtual Reality Painting--PPG Leverages Technology for Training

From 2019 (YouTube Edition): Learning To Paint Without Getting Any On Your Hands PPG's Aerospace Coatings Academy is a tool designed to teach everything one needs to know about all>[...]

Airborne 05.02.25: Joby Crewed Milestone, Diamond Club, Canadian Pilot Insurance

Also: Sustainable Aircraft Test Put Aside, More Falcon 9 Ops, Wyoming ANG Rescue, Oreo Cookie Into Orbit Joby Aviation has reason to celebrate, recently completing its first full t>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC