Boeing 787 Dreamliner Program Completes Static Test Analysis, Gauntlet Tests | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Sat, Dec 12, 2009

Boeing 787 Dreamliner Program Completes Static Test Analysis, Gauntlet Tests

First Flight "Window" Opens December 15th

Boeing completed the review and analysis of the static test that was conducted Nov. 30 on Thursday, validating the side-of-body modification made to the 787 Dreamliner. "I am happy to report that the program has validated the airplane structure for the 787 Dreamliner," said Scott Fancher, vice president and general manager of the 787 program.

Fancher also reported that the 787 team has completed final gauntlet testing on the first airplane. Testing lasted for just two days because only improvements made earlier this year during previous testing had to be examined. "We are very pleased with the results of this final functional testing. With the successful completion of static testing and this functional testing, our focus now moves to first flight."

During the test on the 787 Dreamliner static test airframe, the wing and trailing edges of the airframe were subjected to their limit load -- the highest loads expected to be seen in service. The limit-load test was required to clear the airplane for first flight. Boeing's test strategy is to conduct all limit-load tests and analyze data before conducting the ultimate load series, which is required for certification and will be conducted next year.

Boeing announced June 23 that it was necessary to reinforce an area of structure at the side-of-body section of the 787. The modification entails installing new fittings at 34 stringer locations within the joint where the wing attaches to the fuselage. The 787 team has completed modifications on the first three flight-test airplanes and the full-scale static test airplane.

First flight of the 787 Dreamliner is expected to occur after final flight readiness reviews, receipt of documentation from the U.S. Federal Aviation Administration and taxi testing. Both taxi testing and first flight are subject to weather conditions.

"We are pleased with the pace of progress in preparing to enter our flight test program," said Fancher.

So we know what you're thinking. "Just go fly the darn thing already!" Well, Boeing says on it's website that the "window" for the first flight opens on December 15th. "This date is dependent on final internal reviews, taxi tests and receiving the final experimental ticket from the U.S. Federal Aviation Administration," the company said in a media notice.

FMI: www.boeing.com

Advertisement

More News

NTSB Final Report: Rutan Long-EZ

He Attempted To Restart The Engine Three Times. On The Third Restart Attempt, He Noticed That Flames Were Coming Out From The Right Wing Near The Fuel Cap Analysis: The pilot repor>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

Classic Aero-TV: ICAS Perspectives - Advice for New Air Show Performers

From 2009 (YouTube Edition): Leading Air Show Performers Give Their Best Advice for Newcomers On December 6th through December 9th, the Paris Las Vegas Hotel hosted over 1,500 air >[...]

ANN's Daily Aero-Linx (06.28.25)

Aero Linx: NASA ASRS ASRS captures confidential reports, analyzes the resulting aviation safety data, and disseminates vital information to the aviation community. The ASRS is an i>[...]

Aero-News: Quote of the Day (06.28.25)

“For our inaugural Pylon Racing Seminar in Roswell, we were thrilled to certify 60 pilots across our six closed-course pylon race classes. Not only did this year’s PRS >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC